Development of Integrated Assessment System for Underground Power Cable Performance: A Case Study

The basic operation of any electrical machines that is catered to serve needs of civilization involves electrical power which is the main source to trigger the internal mechanism in the machines then transfer the power to other form of energy such as mechanical, light, sound and etc. The supplies of...

Full description

Saved in:
Bibliographic Details
Main Authors: Faiz, Mohd Turan, Kartina, Johan, Nur Soliha, Sahimi, Nik Hisyamudin, Muhd Nor
Format: Conference or Workshop Item
Language:English
English
Published: IOP Publishing 2017
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/18458/1/Development%20of%20Integrated%20Assessment%20System%20for%20Underground%20Power%20Cable%20Performance-%20A%20Case%20Study.pdf
http://umpir.ump.edu.my/id/eprint/18458/7/Development%20of%20Integrated%20Assessment%20System%20for%20Underground%20Power%20Cable%20Performance-%20A%20Case%20Study%201.pdf
http://umpir.ump.edu.my/id/eprint/18458/
http://iopscience.iop.org/article/10.1088/1757-899X/226/1/012020/pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.18458
record_format eprints
spelling my.ump.umpir.184582018-01-30T01:44:03Z http://umpir.ump.edu.my/id/eprint/18458/ Development of Integrated Assessment System for Underground Power Cable Performance: A Case Study Faiz, Mohd Turan Kartina, Johan Nur Soliha, Sahimi Nik Hisyamudin, Muhd Nor TS Manufactures The basic operation of any electrical machines that is catered to serve needs of civilization involves electrical power which is the main source to trigger the internal mechanism in the machines then transfer the power to other form of energy such as mechanical, light, sound and etc. The supplies of electrical does not happen just by providing the source itself, it has load carrying agent which in many cases, user would refer to it as cable. Specifically, it is the power cable which its ampacity depends significantly on the operation temperature and load stress on it. Apart from having to focus on providing improvement on improving efficiency on the source itself, power cable plays and important role because without it, current ranging from low to high could not be transmitted and hence a failure of the power system generally. Studies have conducted to discuss whether which factor contributes relatively more to the causes of power cable failure or breakdown. Such factors can be narrowed down to the three major causes which are over temperature, over voltage and stress caused by over current. Over current is one of the factor which is depends on the usage of the power system itself. The higher the usage of the power system, higher the chances of over current to take place. This will then produce load stress on the cable which eventually destroy the insulator of the cable and slowly reach the core of the cable. It is believed that an assessment method should be implemented in order to predict the performance and failure rate of the power cable and use this prediction as reference rather than just letting power failure to happen anytime unpredictable which cause huge inconvenience to users and industries. Not only do a method should be implemented, it should be as easy to be used and understood by large range of users and integrated by a graphical user interface to be used. Therefore, this research will further narrow down on the approaches to do so and the location of studies involve Company M which is an agriculture industries which has higher usage on their own underground power cable. Moreover, in the past history the company experienced electrical power failure and this studies and findings will definitely come in hand to provide them necessary help and benefits. IOP Publishing 2017 Conference or Workshop Item PeerReviewed application/pdf en cc_by http://umpir.ump.edu.my/id/eprint/18458/1/Development%20of%20Integrated%20Assessment%20System%20for%20Underground%20Power%20Cable%20Performance-%20A%20Case%20Study.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/18458/7/Development%20of%20Integrated%20Assessment%20System%20for%20Underground%20Power%20Cable%20Performance-%20A%20Case%20Study%201.pdf Faiz, Mohd Turan and Kartina, Johan and Nur Soliha, Sahimi and Nik Hisyamudin, Muhd Nor (2017) Development of Integrated Assessment System for Underground Power Cable Performance: A Case Study. In: 3rd and 4th International Engineering Research and Innovation Symposium, IRIS 2017, 6–7 May 2017 , Melaka, Malaysia. pp. 1-9., 226 (012020). ISSN 1757-8981 (Print); 1757-899X (Online) http://iopscience.iop.org/article/10.1088/1757-899X/226/1/012020/pdf doi:10.1088/1757-899X/226/1/012020
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
English
topic TS Manufactures
spellingShingle TS Manufactures
Faiz, Mohd Turan
Kartina, Johan
Nur Soliha, Sahimi
Nik Hisyamudin, Muhd Nor
Development of Integrated Assessment System for Underground Power Cable Performance: A Case Study
description The basic operation of any electrical machines that is catered to serve needs of civilization involves electrical power which is the main source to trigger the internal mechanism in the machines then transfer the power to other form of energy such as mechanical, light, sound and etc. The supplies of electrical does not happen just by providing the source itself, it has load carrying agent which in many cases, user would refer to it as cable. Specifically, it is the power cable which its ampacity depends significantly on the operation temperature and load stress on it. Apart from having to focus on providing improvement on improving efficiency on the source itself, power cable plays and important role because without it, current ranging from low to high could not be transmitted and hence a failure of the power system generally. Studies have conducted to discuss whether which factor contributes relatively more to the causes of power cable failure or breakdown. Such factors can be narrowed down to the three major causes which are over temperature, over voltage and stress caused by over current. Over current is one of the factor which is depends on the usage of the power system itself. The higher the usage of the power system, higher the chances of over current to take place. This will then produce load stress on the cable which eventually destroy the insulator of the cable and slowly reach the core of the cable. It is believed that an assessment method should be implemented in order to predict the performance and failure rate of the power cable and use this prediction as reference rather than just letting power failure to happen anytime unpredictable which cause huge inconvenience to users and industries. Not only do a method should be implemented, it should be as easy to be used and understood by large range of users and integrated by a graphical user interface to be used. Therefore, this research will further narrow down on the approaches to do so and the location of studies involve Company M which is an agriculture industries which has higher usage on their own underground power cable. Moreover, in the past history the company experienced electrical power failure and this studies and findings will definitely come in hand to provide them necessary help and benefits.
format Conference or Workshop Item
author Faiz, Mohd Turan
Kartina, Johan
Nur Soliha, Sahimi
Nik Hisyamudin, Muhd Nor
author_facet Faiz, Mohd Turan
Kartina, Johan
Nur Soliha, Sahimi
Nik Hisyamudin, Muhd Nor
author_sort Faiz, Mohd Turan
title Development of Integrated Assessment System for Underground Power Cable Performance: A Case Study
title_short Development of Integrated Assessment System for Underground Power Cable Performance: A Case Study
title_full Development of Integrated Assessment System for Underground Power Cable Performance: A Case Study
title_fullStr Development of Integrated Assessment System for Underground Power Cable Performance: A Case Study
title_full_unstemmed Development of Integrated Assessment System for Underground Power Cable Performance: A Case Study
title_sort development of integrated assessment system for underground power cable performance: a case study
publisher IOP Publishing
publishDate 2017
url http://umpir.ump.edu.my/id/eprint/18458/1/Development%20of%20Integrated%20Assessment%20System%20for%20Underground%20Power%20Cable%20Performance-%20A%20Case%20Study.pdf
http://umpir.ump.edu.my/id/eprint/18458/7/Development%20of%20Integrated%20Assessment%20System%20for%20Underground%20Power%20Cable%20Performance-%20A%20Case%20Study%201.pdf
http://umpir.ump.edu.my/id/eprint/18458/
http://iopscience.iop.org/article/10.1088/1757-899X/226/1/012020/pdf
_version_ 1643668452048633856
score 13.209306