Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints

Two-sided assembly line balancing (2S-ALB) problems is practically useful in improving the production of large-sized high-volume products. Many published papers have proposed various approaches to balance this well-known ALB problem. However, little attention is given in formulating the 2S-ALB probl...

Full description

Saved in:
Bibliographic Details
Main Authors: Muhammad Razif, Abdullah Make, M. F. F., Ab Rashid, Muhamad Magffierah, Razali
Format: Conference or Workshop Item
Language:English
Published: IOP Publishing 2016
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/15756/1/2016%20Make_2016_IOP_Conf._Ser.%20Modelling.pdf
http://umpir.ump.edu.my/id/eprint/15756/
http://dx.doi.org/10.1088/1757-899X/160/1/012005
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Two-sided assembly line balancing (2S-ALB) problems is practically useful in improving the production of large-sized high-volume products. Many published papers have proposed various approaches to balance this well-known ALB problem. However, little attention is given in formulating the 2S-ALB problems. In this paper, 2S-ALB is modelled with four different objective functions comprising minimization of workstations, mated- workstation, idle time and resource constraints. In different with existing model, this paper also considers resource constraint with a mathematical modelling formulation in solving the 2S- ALB problems. The modelling procedures are present for each objective functions with a simple 2S-ALB example problem. Then, the anticipated performance solution is obtained from the test problem.