Productivity improvement via simulation method (Manufacturing industry)

Productivity improvement plays an important role in determining whether a company can survive in the future based on customer demands that it can fulfill. In this respect, simulation can be utilized as a what-if analysis tool to decide which productivity improvement strategies to be adopted. This th...

Full description

Saved in:
Bibliographic Details
Main Author: Hasbullah, Mat Isa
Format: Undergraduates Project Papers
Language:English
Published: 2010
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/1401/1/Productivity%20improvement%20via%20simulation%20method%20%28Manufacturing%20industry%29.pdf
http://umpir.ump.edu.my/id/eprint/1401/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.1401
record_format eprints
spelling my.ump.umpir.14012022-04-04T02:32:28Z http://umpir.ump.edu.my/id/eprint/1401/ Productivity improvement via simulation method (Manufacturing industry) Hasbullah, Mat Isa TS Manufactures Productivity improvement plays an important role in determining whether a company can survive in the future based on customer demands that it can fulfill. In this respect, simulation can be utilized as a what-if analysis tool to decide which productivity improvement strategies to be adopted. This thesis presents a simulation of the current performance of outputs and profits using WITNESS simulation software. The main objective of this project is to demonstrate the use of simulation in analyzing the existing production floor performance and in evaluating various alternatives to overcome the existing problem. This project is conducted in an electronic connector manufacturing company located in Shah Alam, Selangor. The production line involved in this project is the assembly line for FX15 model while the product involved in this study is connector manufactured. First, a simulation study on the existing production line is carried out to evaluate the production floor performance. Results of the study revealed that the current production floor was suffering from time working handling. From here, a total of 3 alternative layouts were proposed and they were simulated to determine their effect on the production performance. One way ANOVA test with multiple comparisons was conducted to select the best result. The results again showed a significant difference between each alternative layout and the best alternative to improve the existing production line is the Alternative layout III with productivity increment of 9.15% higher the current situation. 2010-12 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/1401/1/Productivity%20improvement%20via%20simulation%20method%20%28Manufacturing%20industry%29.pdf Hasbullah, Mat Isa (2010) Productivity improvement via simulation method (Manufacturing industry). Faculty of Mechanical Engineering, Universiti Malaysia Pahang.
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TS Manufactures
spellingShingle TS Manufactures
Hasbullah, Mat Isa
Productivity improvement via simulation method (Manufacturing industry)
description Productivity improvement plays an important role in determining whether a company can survive in the future based on customer demands that it can fulfill. In this respect, simulation can be utilized as a what-if analysis tool to decide which productivity improvement strategies to be adopted. This thesis presents a simulation of the current performance of outputs and profits using WITNESS simulation software. The main objective of this project is to demonstrate the use of simulation in analyzing the existing production floor performance and in evaluating various alternatives to overcome the existing problem. This project is conducted in an electronic connector manufacturing company located in Shah Alam, Selangor. The production line involved in this project is the assembly line for FX15 model while the product involved in this study is connector manufactured. First, a simulation study on the existing production line is carried out to evaluate the production floor performance. Results of the study revealed that the current production floor was suffering from time working handling. From here, a total of 3 alternative layouts were proposed and they were simulated to determine their effect on the production performance. One way ANOVA test with multiple comparisons was conducted to select the best result. The results again showed a significant difference between each alternative layout and the best alternative to improve the existing production line is the Alternative layout III with productivity increment of 9.15% higher the current situation.
format Undergraduates Project Papers
author Hasbullah, Mat Isa
author_facet Hasbullah, Mat Isa
author_sort Hasbullah, Mat Isa
title Productivity improvement via simulation method (Manufacturing industry)
title_short Productivity improvement via simulation method (Manufacturing industry)
title_full Productivity improvement via simulation method (Manufacturing industry)
title_fullStr Productivity improvement via simulation method (Manufacturing industry)
title_full_unstemmed Productivity improvement via simulation method (Manufacturing industry)
title_sort productivity improvement via simulation method (manufacturing industry)
publishDate 2010
url http://umpir.ump.edu.my/id/eprint/1401/1/Productivity%20improvement%20via%20simulation%20method%20%28Manufacturing%20industry%29.pdf
http://umpir.ump.edu.my/id/eprint/1401/
_version_ 1729703418211074048
score 13.160551