Case study on supply and demand for parking facilities at LYC Hypermarket (road Gambang-Kuantan)

The parking facilities is an important element in providing good transportation planning policy at a certain area. The increase of demand for parking space especially at shopping area requires ample, comfortable and safe parking space which taken into consideration the potential space and the use of...

Full description

Saved in:
Bibliographic Details
Main Author: Nurshahira Saidatul Hasna , Abdul Jabar
Format: Undergraduates Project Papers
Language:English
Published: 2015
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/12351/1/FKASA%20-%20NURSHAHIRA%20SAIDATUL%20HASNA%20BT%20ABDUL%20JABAR.PDF
http://umpir.ump.edu.my/id/eprint/12351/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.12351
record_format eprints
spelling my.ump.umpir.123512022-02-16T11:23:17Z http://umpir.ump.edu.my/id/eprint/12351/ Case study on supply and demand for parking facilities at LYC Hypermarket (road Gambang-Kuantan) Nurshahira Saidatul Hasna , Abdul Jabar TA Engineering (General). Civil engineering (General) The parking facilities is an important element in providing good transportation planning policy at a certain area. The increase of demand for parking space especially at shopping area requires ample, comfortable and safe parking space which taken into consideration the potential space and the use of ground especially at crowded area. The objective of this research is to assess the demand parking space available at LYC hypermarket, to assess the parking parameter such as duration, occupancy and turnover of parking and to recommend the improvement of parking facilities at LYC hypermarket. The research area is located in road Gambang-Kuantan. The finding from thus research through observation of entering and leaving vehicle method, it is clearly shows that the number of parking space at the LYC hypermarket, Kuantan is sufficient to cater the needs even high demand of consumers especially during peak hours . However, the parking facilities provided does not fulfilled the standard quality of a parking lots and there is no specific entrance and exit to the hypermarket. In preparing the planning of a parking facilities, the organization involved should take into consideration a few important criteria and it has to be planned well as to enable the facilities provided can cater for the increments of the number of vehicles from time to time. 2015-01 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/12351/1/FKASA%20-%20NURSHAHIRA%20SAIDATUL%20HASNA%20BT%20ABDUL%20JABAR.PDF Nurshahira Saidatul Hasna , Abdul Jabar (2015) Case study on supply and demand for parking facilities at LYC Hypermarket (road Gambang-Kuantan). Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Nurshahira Saidatul Hasna , Abdul Jabar
Case study on supply and demand for parking facilities at LYC Hypermarket (road Gambang-Kuantan)
description The parking facilities is an important element in providing good transportation planning policy at a certain area. The increase of demand for parking space especially at shopping area requires ample, comfortable and safe parking space which taken into consideration the potential space and the use of ground especially at crowded area. The objective of this research is to assess the demand parking space available at LYC hypermarket, to assess the parking parameter such as duration, occupancy and turnover of parking and to recommend the improvement of parking facilities at LYC hypermarket. The research area is located in road Gambang-Kuantan. The finding from thus research through observation of entering and leaving vehicle method, it is clearly shows that the number of parking space at the LYC hypermarket, Kuantan is sufficient to cater the needs even high demand of consumers especially during peak hours . However, the parking facilities provided does not fulfilled the standard quality of a parking lots and there is no specific entrance and exit to the hypermarket. In preparing the planning of a parking facilities, the organization involved should take into consideration a few important criteria and it has to be planned well as to enable the facilities provided can cater for the increments of the number of vehicles from time to time.
format Undergraduates Project Papers
author Nurshahira Saidatul Hasna , Abdul Jabar
author_facet Nurshahira Saidatul Hasna , Abdul Jabar
author_sort Nurshahira Saidatul Hasna , Abdul Jabar
title Case study on supply and demand for parking facilities at LYC Hypermarket (road Gambang-Kuantan)
title_short Case study on supply and demand for parking facilities at LYC Hypermarket (road Gambang-Kuantan)
title_full Case study on supply and demand for parking facilities at LYC Hypermarket (road Gambang-Kuantan)
title_fullStr Case study on supply and demand for parking facilities at LYC Hypermarket (road Gambang-Kuantan)
title_full_unstemmed Case study on supply and demand for parking facilities at LYC Hypermarket (road Gambang-Kuantan)
title_sort case study on supply and demand for parking facilities at lyc hypermarket (road gambang-kuantan)
publishDate 2015
url http://umpir.ump.edu.my/id/eprint/12351/1/FKASA%20-%20NURSHAHIRA%20SAIDATUL%20HASNA%20BT%20ABDUL%20JABAR.PDF
http://umpir.ump.edu.my/id/eprint/12351/
_version_ 1725972815958507520
score 13.160551