Compliance of EIA Approval Conditions for Kuala Lumpur - Putrajaya - KLIA Highway Project

The study was to identify the compliance of Environmental Impact Assessment (EIA) Approval Conditions in conditions terms of total suspended solods (TSS) discharge from the silt trap and in the rivers for Kuala Lumpur - Putrajaya - KLIA highway construction project, Malaysia. The data from August 20...

Full description

Saved in:
Bibliographic Details
Main Authors: Aweng Eh Rak, Zainai Mohamed
Format: Conference or Workshop Item
Language:English
Published: 2011
Online Access:http://discol.umk.edu.my/id/eprint/8866/1/Conference%20Paper_8.pdf
http://discol.umk.edu.my/id/eprint/8866/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.umk.eprints.8866
record_format eprints
spelling my.umk.eprints.88662022-05-23T13:08:34Z http://discol.umk.edu.my/id/eprint/8866/ Compliance of EIA Approval Conditions for Kuala Lumpur - Putrajaya - KLIA Highway Project Aweng Eh Rak Zainai Mohamed The study was to identify the compliance of Environmental Impact Assessment (EIA) Approval Conditions in conditions terms of total suspended solods (TSS) discharge from the silt trap and in the rivers for Kuala Lumpur - Putrajaya - KLIA highway construction project, Malaysia. The data from August 2005 to May 2007 was obtained from Department of Environment, Kuala Lumpur. This project was chosen for the study because this project was among the early projects after the implementation of Erosion and Sediment Control Plan (ESCP). The highway cut across several rivers where a total of suspended solids (TSS) were measured at upstreams and downstreams with a total of twelve (12) stations. In addition, twelve (12) sampling stations for the silt trap discharge located along the rivers were also measured. The results have shown that fifteen (15) out of one hundred and thirty two (132) samplings for river stations recorded incompliance of about 11.4% and seven (7) out of fifty two (52) samplings for silt trap discharge stations recorded incompliance of about 13.5%. 2011 Conference or Workshop Item NonPeerReviewed text en http://discol.umk.edu.my/id/eprint/8866/1/Conference%20Paper_8.pdf Aweng Eh Rak and Zainai Mohamed (2011) Compliance of EIA Approval Conditions for Kuala Lumpur - Putrajaya - KLIA Highway Project. In: UNSPECIFIED.
institution Universiti Malaysia Kelantan
building Perpustakaan Universiti Malaysia Kelantan
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Kelantan
content_source UMK Institutional Repository
url_provider http://umkeprints.umk.edu.my/
language English
description The study was to identify the compliance of Environmental Impact Assessment (EIA) Approval Conditions in conditions terms of total suspended solods (TSS) discharge from the silt trap and in the rivers for Kuala Lumpur - Putrajaya - KLIA highway construction project, Malaysia. The data from August 2005 to May 2007 was obtained from Department of Environment, Kuala Lumpur. This project was chosen for the study because this project was among the early projects after the implementation of Erosion and Sediment Control Plan (ESCP). The highway cut across several rivers where a total of suspended solids (TSS) were measured at upstreams and downstreams with a total of twelve (12) stations. In addition, twelve (12) sampling stations for the silt trap discharge located along the rivers were also measured. The results have shown that fifteen (15) out of one hundred and thirty two (132) samplings for river stations recorded incompliance of about 11.4% and seven (7) out of fifty two (52) samplings for silt trap discharge stations recorded incompliance of about 13.5%.
format Conference or Workshop Item
author Aweng Eh Rak
Zainai Mohamed
spellingShingle Aweng Eh Rak
Zainai Mohamed
Compliance of EIA Approval Conditions for Kuala Lumpur - Putrajaya - KLIA Highway Project
author_facet Aweng Eh Rak
Zainai Mohamed
author_sort Aweng Eh Rak
title Compliance of EIA Approval Conditions for Kuala Lumpur - Putrajaya - KLIA Highway Project
title_short Compliance of EIA Approval Conditions for Kuala Lumpur - Putrajaya - KLIA Highway Project
title_full Compliance of EIA Approval Conditions for Kuala Lumpur - Putrajaya - KLIA Highway Project
title_fullStr Compliance of EIA Approval Conditions for Kuala Lumpur - Putrajaya - KLIA Highway Project
title_full_unstemmed Compliance of EIA Approval Conditions for Kuala Lumpur - Putrajaya - KLIA Highway Project
title_sort compliance of eia approval conditions for kuala lumpur - putrajaya - klia highway project
publishDate 2011
url http://discol.umk.edu.my/id/eprint/8866/1/Conference%20Paper_8.pdf
http://discol.umk.edu.my/id/eprint/8866/
_version_ 1763304024520523776
score 13.18916