FSKTM on-line room booking system / Ser Ah Ming

The purpose of this report is to document the essential information and need to develop this system that is On-line Room Booking System. This report is mainly divided into 6 chapter. A brief synopsis of each chip is as follows: Chapter 1 The introduction: The Faculty background, project introduc...

Full description

Saved in:
Bibliographic Details
Main Author: Ser, Ah Ming
Format: Thesis
Published: 2000
Subjects:
Online Access:http://studentsrepo.um.edu.my/9253/4/FSKTM_online_room_booking_system.pdf
http://studentsrepo.um.edu.my/9253/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The purpose of this report is to document the essential information and need to develop this system that is On-line Room Booking System. This report is mainly divided into 6 chapter. A brief synopsis of each chip is as follows: Chapter 1 The introduction: The Faculty background, project introduction, objective, scope and goals for projects, also have the overview projects and the project scheduling. Chapter 2 Literature Review: Such as the system analysis and synthesis project. This chapter include the fact-finding, requirement analysis, analysis of current system, reference to the existing system list of resources surveyed, the internet definitions and the web application development tools. The facilities requirement consider the software and hardware are used to develop the system. Chapter 3 Project Methodology: The project implementation use the system development life cycle, that are include the seven phase. Planning, System Analysis, System Design, Programming, Testing and Evaluation, Documentation, System Implementation. Chapter 4 System Design: Include the process design, module relationship, Description for module system, data flow diagram and entity relationship diagrams for proposed system. Also have the database design and the user interface design. Chapter 5 System Implementation include the System Development, Resource Environment Preparation, Site Preparation, Training, Debugging, Testing, System Conversion and Post Implementation Review. Chapter 6 System Evaluation include the System Strength, System Limitations, Project Problems and Solutions, Future Enhancement. Chapter 7 Conclusion, the project was successful develop.