Practical completion liquidated damages in construction contracts /Lai Sze Ching
Practical completion is a term widely used in construction contract. However, there is unfortunate there is no firm legally define meaning for the term the court had define it nonetheless there is no single view that is acceptable universally by the court.
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Published: |
2009
|
Subjects: | |
Online Access: | http://studentsrepo.um.edu.my/8172/1/practical_completion.pdf http://studentsrepo.um.edu.my/8172/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.um.stud.8172 |
---|---|
record_format |
eprints |
spelling |
my.um.stud.81722017-12-29T08:25:22Z Practical completion liquidated damages in construction contracts /Lai Sze Ching Lai, Sze Ching K Law (General) Practical completion is a term widely used in construction contract. However, there is unfortunate there is no firm legally define meaning for the term the court had define it nonetheless there is no single view that is acceptable universally by the court. 2009 Thesis NonPeerReviewed application/pdf http://studentsrepo.um.edu.my/8172/1/practical_completion.pdf Lai, Sze Ching (2009) Practical completion liquidated damages in construction contracts /Lai Sze Ching. Masters thesis, University of Malaya . http://studentsrepo.um.edu.my/8172/ |
institution |
Universiti Malaya |
building |
UM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaya |
content_source |
UM Student Repository |
url_provider |
http://studentsrepo.um.edu.my/ |
topic |
K Law (General) |
spellingShingle |
K Law (General) Lai, Sze Ching Practical completion liquidated damages in construction contracts /Lai Sze Ching |
description |
Practical completion is a term widely used in construction contract. However, there is unfortunate there is no firm legally define meaning for the term the court had define it nonetheless there is no single view that is acceptable universally by the court. |
format |
Thesis |
author |
Lai, Sze Ching |
author_facet |
Lai, Sze Ching |
author_sort |
Lai, Sze Ching |
title |
Practical completion liquidated damages in construction contracts /Lai Sze Ching |
title_short |
Practical completion liquidated damages in construction contracts /Lai Sze Ching |
title_full |
Practical completion liquidated damages in construction contracts /Lai Sze Ching |
title_fullStr |
Practical completion liquidated damages in construction contracts /Lai Sze Ching |
title_full_unstemmed |
Practical completion liquidated damages in construction contracts /Lai Sze Ching |
title_sort |
practical completion liquidated damages in construction contracts /lai sze ching |
publishDate |
2009 |
url |
http://studentsrepo.um.edu.my/8172/1/practical_completion.pdf http://studentsrepo.um.edu.my/8172/ |
_version_ |
1738506109433413632 |
score |
13.160551 |