Building information modelling readiness level for government project in Malaysia / Chong Chee Ying
The Malaysian construction industry has often been associated with low productivity, quality and standards, despite being one of the major sectors contributing to the Gross Domestic Product (GDP) of the country. The Construction Industry Development Board Malaysia (CIDB) highly encourages the adopti...
Saved in:
Main Author: | Chong , Chee Ying |
---|---|
Format: | Thesis |
Published: |
2021
|
Subjects: | |
Online Access: | http://studentsrepo.um.edu.my/14937/2/Chong_Chee_Ying.pdf http://studentsrepo.um.edu.my/14937/4/Chong_Chee_Ying.pdf http://studentsrepo.um.edu.my/14937/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Success factors of information technology project implementation : a case study of a manufacturing company / Foong Poh Chee.
by: Fong, Poh Chee
Published: (2002) -
Pioneer industries and industrialization in Malaysia / Cheong Chee Hong
by: Cheong, Chee Hong
Published: (1970) -
Readiness Assessment for Implementation of Integrated Project Delivery (IPD) in Industrialised Building System (IBS) Projects
by: Osman, Wan Nadzri, et al.
Published: (2015) -
A study on the national car industry (PROTON) and its impact on the Malaysian economy / Chee Keem Chau
by: Chee, Keem Chau
Published: (1995) -
A study of job satisfaction among Royal Malaysian Air Force air defence operators / Tan Chee Seng
by: Tan, Chee Seng
Published: (2009)