Determining the delay factors for reconstructed mega-project’s phases and the associated challenges / Basem Adnan Al Khatib
In recent decades, the construction industry has developed rapidly. Delays in construction projects are a common phenomenon throughout industry. It was and remains one of the most important challenges negatively affecting not only this industry but also the economy. Many studies were conducted to id...
Saved in:
Main Author: | Basem Adnan , Al Khatib |
---|---|
Format: | Thesis |
Published: |
2021
|
Subjects: | |
Online Access: | http://studentsrepo.um.edu.my/13998/1/Basem_Adnan.pdf http://studentsrepo.um.edu.my/13998/2/Basem_Adnan.pdf http://studentsrepo.um.edu.my/13998/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project
by: Al Khatib, Basem, et al.
Published: (2018) -
Causes of project delay and cost overrun of mega projects in peninsular Malaysia
by: Nur Aliya Najiha, Tamrin
Published: (2019) -
Delay Factors Management and Ranking for Reconstruction and Rehabilitation Projects Based on the Relative Importance Index (RII)
by: Al Khatib, Basem, et al.
Published: (2020) -
Conflicts and delays in mega construction projects – Kuwait International Airport Cargo City
by: Alazemi, Mohammad KhTh E, et al.
Published: (2019) -
Mega projects to be reviewed
by: Mazwin, Nik Anis, et al.
Published: (2019)