Impact of CMMI based software process maturity on COCOMO II's effort estimation

The software capability maturity model has become a popular model for enhancing software development processes with the goal of developing high-quality software within budget and schedule. The software cost estimation model, constructive cost model, in its last update (constructive cost model II) ha...

Full description

Saved in:
Bibliographic Details
Main Authors: Al Yahya, M., Ahmad, R., Lee, S.P.
Format: Article
Published: 2010
Subjects:
Online Access:http://eprints.um.edu.my/6806/
http://www.ccis2k.org/iajit/PDF/vol.7,no.2/725.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.um.eprints.6806
record_format eprints
spelling my.um.eprints.68062013-07-08T02:48:49Z http://eprints.um.edu.my/6806/ Impact of CMMI based software process maturity on COCOMO II's effort estimation Al Yahya, M. Ahmad, R. Lee, S.P. QA76 Computer software The software capability maturity model has become a popular model for enhancing software development processes with the goal of developing high-quality software within budget and schedule. The software cost estimation model, constructive cost model, in its last update (constructive cost model II) has a set of seventeen cost drivers and a set of five scale factors. Process maturity is one of the five scale factors and its ratings are based on software capability maturity model. This paper examines the effect of process maturity on software development effort by deriving a new set of constructive cost model II's PMAT rating values based on the most recent version of CMM, i.e., capability maturity model integration. The precise data for the analysis was collected from the record of 40 historical projects which spanned the range of capability maturity model integration levels, from level 1 (lower half and upper half) to level 4, where eight data points were collected from each level. We followed the ideal scale factor method in order to withhold the effect of the constructive cost model II's PMAT scale factor. All prediction accuracies were measured using PRED. The study showed that the proposed model (with the new PMAT rating values) yielded better estimates as compared to the generic, constructive cost model II model's estimates. 2010 Article PeerReviewed Al Yahya, M. and Ahmad, R. and Lee, S.P. (2010) Impact of CMMI based software process maturity on COCOMO II's effort estimation. International Arab Journal of Information Technology, 7 (2). pp. 129-137. ISSN 1683-3198 http://www.ccis2k.org/iajit/PDF/vol.7,no.2/725.pdf
institution Universiti Malaya
building UM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaya
content_source UM Research Repository
url_provider http://eprints.um.edu.my/
topic QA76 Computer software
spellingShingle QA76 Computer software
Al Yahya, M.
Ahmad, R.
Lee, S.P.
Impact of CMMI based software process maturity on COCOMO II's effort estimation
description The software capability maturity model has become a popular model for enhancing software development processes with the goal of developing high-quality software within budget and schedule. The software cost estimation model, constructive cost model, in its last update (constructive cost model II) has a set of seventeen cost drivers and a set of five scale factors. Process maturity is one of the five scale factors and its ratings are based on software capability maturity model. This paper examines the effect of process maturity on software development effort by deriving a new set of constructive cost model II's PMAT rating values based on the most recent version of CMM, i.e., capability maturity model integration. The precise data for the analysis was collected from the record of 40 historical projects which spanned the range of capability maturity model integration levels, from level 1 (lower half and upper half) to level 4, where eight data points were collected from each level. We followed the ideal scale factor method in order to withhold the effect of the constructive cost model II's PMAT scale factor. All prediction accuracies were measured using PRED. The study showed that the proposed model (with the new PMAT rating values) yielded better estimates as compared to the generic, constructive cost model II model's estimates.
format Article
author Al Yahya, M.
Ahmad, R.
Lee, S.P.
author_facet Al Yahya, M.
Ahmad, R.
Lee, S.P.
author_sort Al Yahya, M.
title Impact of CMMI based software process maturity on COCOMO II's effort estimation
title_short Impact of CMMI based software process maturity on COCOMO II's effort estimation
title_full Impact of CMMI based software process maturity on COCOMO II's effort estimation
title_fullStr Impact of CMMI based software process maturity on COCOMO II's effort estimation
title_full_unstemmed Impact of CMMI based software process maturity on COCOMO II's effort estimation
title_sort impact of cmmi based software process maturity on cocomo ii's effort estimation
publishDate 2010
url http://eprints.um.edu.my/6806/
http://www.ccis2k.org/iajit/PDF/vol.7,no.2/725.pdf
_version_ 1643687886807105536
score 13.160551