Removal of zinc from rubber thread manufacturing industry wastewater using chemical precipitant/flocculant

Wastewater from the rubber thread manufacturing industry is acidic in nature with PH in the range of 3.8 to 4.4 and containing high concentrations of COD, BOD, Total-N and zinc. The high BOD and COD ratio of the wastewater (0.78 to 0.90) indicates that the rubber wastewater is biodegradable and can...

Full description

Saved in:
Bibliographic Details
Main Authors: Subbiah, R.M., Sastry, C.A., Agamuthu, Pariatamby
Format: Article
Published: 2000
Subjects:
Online Access:http://eprints.um.edu.my/5027/
http://onlinelibrary.wiley.com/store/10.1002/ep.670190418/asset/670190418_ftp.pdf?v=1&t=h99bh0q1&s=f3df108dee08b2d012b9ae882d4dd78297368f08
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.um.eprints.5027
record_format eprints
spelling my.um.eprints.50272019-12-06T06:30:07Z http://eprints.um.edu.my/5027/ Removal of zinc from rubber thread manufacturing industry wastewater using chemical precipitant/flocculant Subbiah, R.M. Sastry, C.A. Agamuthu, Pariatamby QH301 Biology Wastewater from the rubber thread manufacturing industry is acidic in nature with PH in the range of 3.8 to 4.4 and containing high concentrations of COD, BOD, Total-N and zinc. The high BOD and COD ratio of the wastewater (0.78 to 0.90) indicates that the rubber wastewater is biodegradable and can be treated effectively by an anaerobic digestion process commonly employed in this industry. However, because the wastewater contained high concentrations of zinc, 250 to 310 mg/L, which could inhibit the digestion process, it was pretreated by chemical precipitation/flocculation. A treatment process using a combination of sodium sulfide and polyelectrolyte LT 27 at concentrations of 800 and 5 mg/L, respectively, is the most cost-effective system for zinc removal from the wastewater Zinc removal by sodium sulfide is not affected by pH. The optimum settling time was 60 min, whereas the optimum flocculation time was 20 min, and a speed of 20 rpm in a 110 mm diameter reactor gave the best res The estimated cost of zinc removal using this method was RM1.04/m(3) (US $0.26/m(3)) of wastewater discharged. 2000 Article PeerReviewed Subbiah, R.M. and Sastry, C.A. and Agamuthu, Pariatamby (2000) Removal of zinc from rubber thread manufacturing industry wastewater using chemical precipitant/flocculant. Environmental Progress, 19 (4). pp. 299-304. ISSN 0278-4491 http://onlinelibrary.wiley.com/store/10.1002/ep.670190418/asset/670190418_ftp.pdf?v=1&t=h99bh0q1&s=f3df108dee08b2d012b9ae882d4dd78297368f08 10.1002/ep.670190418
institution Universiti Malaya
building UM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaya
content_source UM Research Repository
url_provider http://eprints.um.edu.my/
topic QH301 Biology
spellingShingle QH301 Biology
Subbiah, R.M.
Sastry, C.A.
Agamuthu, Pariatamby
Removal of zinc from rubber thread manufacturing industry wastewater using chemical precipitant/flocculant
description Wastewater from the rubber thread manufacturing industry is acidic in nature with PH in the range of 3.8 to 4.4 and containing high concentrations of COD, BOD, Total-N and zinc. The high BOD and COD ratio of the wastewater (0.78 to 0.90) indicates that the rubber wastewater is biodegradable and can be treated effectively by an anaerobic digestion process commonly employed in this industry. However, because the wastewater contained high concentrations of zinc, 250 to 310 mg/L, which could inhibit the digestion process, it was pretreated by chemical precipitation/flocculation. A treatment process using a combination of sodium sulfide and polyelectrolyte LT 27 at concentrations of 800 and 5 mg/L, respectively, is the most cost-effective system for zinc removal from the wastewater Zinc removal by sodium sulfide is not affected by pH. The optimum settling time was 60 min, whereas the optimum flocculation time was 20 min, and a speed of 20 rpm in a 110 mm diameter reactor gave the best res The estimated cost of zinc removal using this method was RM1.04/m(3) (US $0.26/m(3)) of wastewater discharged.
format Article
author Subbiah, R.M.
Sastry, C.A.
Agamuthu, Pariatamby
author_facet Subbiah, R.M.
Sastry, C.A.
Agamuthu, Pariatamby
author_sort Subbiah, R.M.
title Removal of zinc from rubber thread manufacturing industry wastewater using chemical precipitant/flocculant
title_short Removal of zinc from rubber thread manufacturing industry wastewater using chemical precipitant/flocculant
title_full Removal of zinc from rubber thread manufacturing industry wastewater using chemical precipitant/flocculant
title_fullStr Removal of zinc from rubber thread manufacturing industry wastewater using chemical precipitant/flocculant
title_full_unstemmed Removal of zinc from rubber thread manufacturing industry wastewater using chemical precipitant/flocculant
title_sort removal of zinc from rubber thread manufacturing industry wastewater using chemical precipitant/flocculant
publishDate 2000
url http://eprints.um.edu.my/5027/
http://onlinelibrary.wiley.com/store/10.1002/ep.670190418/asset/670190418_ftp.pdf?v=1&t=h99bh0q1&s=f3df108dee08b2d012b9ae882d4dd78297368f08
_version_ 1654960610939502592
score 13.214268