Line balancing and performance improvements: A case study of a television assembly plant

Ever-increasing customer demand and its' diversification necessitates organizations to respond by continuously increasing their production throughput and making changes in their production mix. An important strategy to increase productivity is to improve the efficiency of the production or asse...

Full description

Saved in:
Bibliographic Details
Main Authors: Munisamy, Susila, Kok, Soak Chen
Format: Article
Published: Faculty of Science, University of Malaya 2007
Subjects:
Online Access:http://eprints.um.edu.my/25468/
https://mjs.um.edu.my/article/view/8735
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.um.eprints.25468
record_format eprints
spelling my.um.eprints.254682020-08-27T02:31:57Z http://eprints.um.edu.my/25468/ Line balancing and performance improvements: A case study of a television assembly plant Munisamy, Susila Kok, Soak Chen HA Statistics Ever-increasing customer demand and its' diversification necessitates organizations to respond by continuously increasing their production throughput and making changes in their production mix. An important strategy to increase productivity is to improve the efficiency of the production or assembly lines, so that production throughput can be increased close to the production capacity of the system. Line balancing can improve the efficiency of an assembly line. This paper focuses on the assembly line of a local television assembly plant. The objective of this study is to improve the efficiency of the television assembly line by assigning tasks to workstations to balance work across stations such as to minimise the number of works stations along the television assembly line, given the production rate or cycle time. We use a modified incremental utilisation heuristic to redesign the local television assembly plant and show that significant improvements in resource utilisation and reduction in operational costs can be achieved. Faculty of Science, University of Malaya 2007 Article PeerReviewed Munisamy, Susila and Kok, Soak Chen (2007) Line balancing and performance improvements: A case study of a television assembly plant. Malaysian Journal of Science, 26 (Sp.). pp. 125-137. ISSN 1394-3065 https://mjs.um.edu.my/article/view/8735
institution Universiti Malaya
building UM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaya
content_source UM Research Repository
url_provider http://eprints.um.edu.my/
topic HA Statistics
spellingShingle HA Statistics
Munisamy, Susila
Kok, Soak Chen
Line balancing and performance improvements: A case study of a television assembly plant
description Ever-increasing customer demand and its' diversification necessitates organizations to respond by continuously increasing their production throughput and making changes in their production mix. An important strategy to increase productivity is to improve the efficiency of the production or assembly lines, so that production throughput can be increased close to the production capacity of the system. Line balancing can improve the efficiency of an assembly line. This paper focuses on the assembly line of a local television assembly plant. The objective of this study is to improve the efficiency of the television assembly line by assigning tasks to workstations to balance work across stations such as to minimise the number of works stations along the television assembly line, given the production rate or cycle time. We use a modified incremental utilisation heuristic to redesign the local television assembly plant and show that significant improvements in resource utilisation and reduction in operational costs can be achieved.
format Article
author Munisamy, Susila
Kok, Soak Chen
author_facet Munisamy, Susila
Kok, Soak Chen
author_sort Munisamy, Susila
title Line balancing and performance improvements: A case study of a television assembly plant
title_short Line balancing and performance improvements: A case study of a television assembly plant
title_full Line balancing and performance improvements: A case study of a television assembly plant
title_fullStr Line balancing and performance improvements: A case study of a television assembly plant
title_full_unstemmed Line balancing and performance improvements: A case study of a television assembly plant
title_sort line balancing and performance improvements: a case study of a television assembly plant
publisher Faculty of Science, University of Malaya
publishDate 2007
url http://eprints.um.edu.my/25468/
https://mjs.um.edu.my/article/view/8735
_version_ 1680857035195809792
score 13.160551