TPM can go beyond maintenance: excerpt from a case implementation

Purpose - The aim of this paper is to present a generic model on using the total productive maintenance (TPM) concept in conjunction with ecology oriented manufacturing (EOM) and 5S focusing on their joint strengths in attaining organizational goals in furtherance to the equipment maintenance object...

Full description

Saved in:
Bibliographic Details
Main Authors: Ahmed, Shamsuddin, Masjuki, Haji Hassan, Taha, Zahari
Format: Article
Published: Emerald 2005
Subjects:
Online Access:http://eprints.um.edu.my/24466/
https://doi.org/10.1108/13552510510589352
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.um.eprints.24466
record_format eprints
spelling my.um.eprints.244662020-05-29T02:21:24Z http://eprints.um.edu.my/24466/ TPM can go beyond maintenance: excerpt from a case implementation Ahmed, Shamsuddin Masjuki, Haji Hassan Taha, Zahari TJ Mechanical engineering and machinery Purpose - The aim of this paper is to present a generic model on using the total productive maintenance (TPM) concept in conjunction with ecology oriented manufacturing (EOM) and 5S focusing on their joint strengths in attaining organizational goals in furtherance to the equipment maintenance objectives. Design/methodology/approach - A systematic implementation-framework coupled with the standard tools, techniques and practices has been designed. The framework was applied in a large semiconductor manufacturing company. Findings - It is evident that a well drawn TPM implementation plan not only improves equipment efficiency and effectiveness but also brings appreciable improvements in other areas such as reduction of manufacturing cycle time, size of inventory, customer complaints, and creates cohesive small group autonomous teams and increases the skill and confidence of individuals. The resulting system is found to be more productive in terms of both partial and total productivity measures. This is in line with the current need of manufacturing companies to have an integrated manufacturing management system (IMMS) in order to simultaneously increasing efficiency and improving effectiveness. Practical implications - The applied framework can be mimicked by other manufacturing organizations and similar results could be brought about. As the implementation of TMP in conjunction with the EOM and 5S has come out successful, this can be combined with other manufacturing planning and control (MPC) systems (viz. JIT, MRPII/ERP) to develop an IT-based IMMS. Originality/value - The case study presented here shows that the applications of TPM through the fulfillment of its basic requirements can significantly enhance the accomplishment of organizational objectives beyond the equipment maintenance-subsystem goals and add an array of benefits in the value chain across the various functional areas. © Emerald Group Publishing Limited. Emerald 2005 Article PeerReviewed Ahmed, Shamsuddin and Masjuki, Haji Hassan and Taha, Zahari (2005) TPM can go beyond maintenance: excerpt from a case implementation. Journal of Quality in Maintenance Engineering, 11 (1). pp. 19-42. ISSN 1355-2511 https://doi.org/10.1108/13552510510589352 doi:10.1108/13552510510589352
institution Universiti Malaya
building UM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaya
content_source UM Research Repository
url_provider http://eprints.um.edu.my/
topic TJ Mechanical engineering and machinery
spellingShingle TJ Mechanical engineering and machinery
Ahmed, Shamsuddin
Masjuki, Haji Hassan
Taha, Zahari
TPM can go beyond maintenance: excerpt from a case implementation
description Purpose - The aim of this paper is to present a generic model on using the total productive maintenance (TPM) concept in conjunction with ecology oriented manufacturing (EOM) and 5S focusing on their joint strengths in attaining organizational goals in furtherance to the equipment maintenance objectives. Design/methodology/approach - A systematic implementation-framework coupled with the standard tools, techniques and practices has been designed. The framework was applied in a large semiconductor manufacturing company. Findings - It is evident that a well drawn TPM implementation plan not only improves equipment efficiency and effectiveness but also brings appreciable improvements in other areas such as reduction of manufacturing cycle time, size of inventory, customer complaints, and creates cohesive small group autonomous teams and increases the skill and confidence of individuals. The resulting system is found to be more productive in terms of both partial and total productivity measures. This is in line with the current need of manufacturing companies to have an integrated manufacturing management system (IMMS) in order to simultaneously increasing efficiency and improving effectiveness. Practical implications - The applied framework can be mimicked by other manufacturing organizations and similar results could be brought about. As the implementation of TMP in conjunction with the EOM and 5S has come out successful, this can be combined with other manufacturing planning and control (MPC) systems (viz. JIT, MRPII/ERP) to develop an IT-based IMMS. Originality/value - The case study presented here shows that the applications of TPM through the fulfillment of its basic requirements can significantly enhance the accomplishment of organizational objectives beyond the equipment maintenance-subsystem goals and add an array of benefits in the value chain across the various functional areas. © Emerald Group Publishing Limited.
format Article
author Ahmed, Shamsuddin
Masjuki, Haji Hassan
Taha, Zahari
author_facet Ahmed, Shamsuddin
Masjuki, Haji Hassan
Taha, Zahari
author_sort Ahmed, Shamsuddin
title TPM can go beyond maintenance: excerpt from a case implementation
title_short TPM can go beyond maintenance: excerpt from a case implementation
title_full TPM can go beyond maintenance: excerpt from a case implementation
title_fullStr TPM can go beyond maintenance: excerpt from a case implementation
title_full_unstemmed TPM can go beyond maintenance: excerpt from a case implementation
title_sort tpm can go beyond maintenance: excerpt from a case implementation
publisher Emerald
publishDate 2005
url http://eprints.um.edu.my/24466/
https://doi.org/10.1108/13552510510589352
_version_ 1669008003563520000
score 13.209306