A new forecasting model to improve earned value index to achieve an accurate project time and cost estimation
This paper presents a new forecasting model to improve Earned Value (EV) method of projects. This method improves earned value management system (EVMS) and forecasting time and cost for projects. These method use established consists of four variables: Scheduled Performance Index (SPI), Cost Perform...
Saved in:
Main Authors: | Attarzadeh, I., Hock, O.S. |
---|---|
Format: | Conference or Workshop Item |
Published: |
2009
|
Subjects: | |
Online Access: | http://eprints.um.edu.my/2284/ http://apps.webofknowledge.com/full_record.do?product=UA&search_mode=Refine&qid=3&SID=S1olJgKm7P7b1AoN2hb&page=17&doc=161&cacheurlFromRightClick=no |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Implementation and evaluation of earned value index to achieve an accurate project time and cost estimation and improve "Earned Value Management System"
by: Attarzadeh, I., et al.
Published: (2009) -
Using enhancement method to improve earned value index to achieve an accurate project time and cost estimation
by: Attarzadeh, I., et al.
Published: (2009) -
Neural networks for accurate estimation of software metrics
by: Vahid Khatibi, B., et al.
Published: (2011) -
Crystal Method For Accurate Software Duration
Estimation
by: Sobah, Periasamy, et al.
Published: (2007) -
Time series modeling and forecasting of the consumer price index Bandar Lampung
by: Kharimah, Faiga, et al.
Published: (2015)