Developing a risk-based inspection practices maturity model for Malaysian industries
A framework was formulated based on the model of MIRM (2008) to measure the risk-based inspection (RBI) practices maturity level in the Malaysian RBI scheme users. The RBI Practices Maturity Model will assess the level of compliance and effectiveness with a recently introduced regulatory instrument...
Saved in:
Main Authors: | Mohamed, Ramuna, Hassan, Che Rosmani Che, Hamid, Mahar Diana |
---|---|
Format: | Article |
Published: |
Elsevier
2018
|
Subjects: | |
Online Access: | http://eprints.um.edu.my/21250/ https://doi.org/10.1016/j.jlp.2018.08.011 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Implementing risk-based inspection approach: Is it beneficial for pressure equipment in Malaysia industries?
by: Mohamed, Ramuna, et al.
Published: (2017) -
Critical success factors of risk-based inspection
by: Mohamed, Ramuna, et al.
Published: (2018) -
Safety culture maturity measurement methods: A systematic literature review
by: Ayob, Aida Normardiana, et al.
Published: (2022) -
The relationship of safety climate factors, decision making attitude, risk control, and risk estimate in Malaysian radiation facilities
by: Kasim, Hazmimi, et al.
Published: (2019) -
Determination of factors affecting safety practices in Malaysian radiation facilities
by: Kasim, Hazmimi, et al.
Published: (2018)