Challenges in technologies and innovations on maintenance operation of building envelope for high-rise building
High-rise building mostly designed in curtain walling confront with troubles during maintenance operation. A high risk in manual and semi-manual operation facing the issue in dealing with technology, expertise, equipment and environment collision is the main agenda of this study. Perhaps, this study...
Saved in:
Main Authors: | Salim, Nuzaihan Aras Agus, Full, Loen Chin, Salleh, Naziah Muhamad, Kamaruzzaman, Syahrul Nizam, Azizi, Nurul Sakina Mokhtar |
---|---|
Format: | Article |
Published: |
Construction Research Institute of Malaysia
2018
|
Subjects: | |
Online Access: | http://eprints.um.edu.my/20799/ https://www.cream.my/main/index.php/publication/malaysian-construction-research-journal-mcrj |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Biomimetic Architecture in Building Envelope Maintenance
(A Literature)
by: Agus Salim, N.A., et al.
Published: (2014) -
Thermal performance evaluation of double panel glass windows
by: Salleh, Naziah Muhamad, et al.
Published: (2018) -
Building information modeling (BIM) capabilities in the operation and maintenance phase of green buildings: A systematic review
by: Cao, Yu, et al.
Published: (2022) -
Design Failure Affecting Maintenance Management on Public Higher Education Institution in Malaysia
by: Aras Agus Salim, Nuzaihan, et al.
Published: (2016) -
Practice of building maintenance management operation processes in office high rise buildings in Malaysia
by: Mohamad Ridzuan, Yahya
Published: (2011)