Power System Restoration Planning Strategy Based on Optimal Energizing Time of Sectionalizing Islands
Common power system restoration planning strategy is based on a 'build up' approach, where a blackout system is sectionalized among several islands for parallel restoration prior to resynchronization. In order to speed up the resynchronization of the islands, each island must have similar...
Saved in:
Main Authors: | Talib, Dian Najihah Abu, Mokhlis, Hazlie, Abu Talip, Mohamad Sofian, Naidu, Kanendra, Suyono, Hadi |
---|---|
Format: | Article |
Published: |
MDPI
2018
|
Subjects: | |
Online Access: | http://eprints.um.edu.my/20556/ https://doi.org/10.3390/en11051316 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Restoration planning strategy of transmission system based on optimal energizing time of sectionalizing islands / Dian Najihah Abu Talib
by: Dian Najihah , Abu Talib
Published: (2019) -
Parallel power system restoration planning using heuristic initialization and discrete evolutionary programming
by: Abu Talib, D.N., et al.
Published: (2017) -
Self-rechargeable energizers for sustainability
by: Ling, JinKiong, et al.
Published: (2022) -
Cognitive energizer
by: Qamaruz Zaman, Faridah, et al.
Published: (2012) -
Simulation of the energization of a single-phase transformer
by: Nawawi, Azahar
Published: (2001)