Causes of high variance in building conservation tenders in Malaysia

Purpose – The purpose of this paper is to identify the reasons for the variance among tenders for conservation projects in Malaysia. Design/methodology/approach – Semi-structured interview approach was adopted because this method allows for effective probing of issues. The interviews are conducted w...

Full description

Saved in:
Bibliographic Details
Main Authors: Yoke Mui, L., Yahaya, A., Nabavi, F.
Format: Article
Published: Emerald 2016
Subjects:
Online Access:http://eprints.um.edu.my/18771/
http://dx.doi.org/10.1108/SS-04-2015-0023
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.um.eprints.18771
record_format eprints
spelling my.um.eprints.187712018-05-30T07:28:07Z http://eprints.um.edu.my/18771/ Causes of high variance in building conservation tenders in Malaysia Yoke Mui, L. Yahaya, A. Nabavi, F. TH Building construction Purpose – The purpose of this paper is to identify the reasons for the variance among tenders for conservation projects in Malaysia. Design/methodology/approach – Semi-structured interview approach was adopted because this method allows for effective probing of issues. The interviews are conducted with experienced conservation contractors. The interviews are transcribed and the data are analysed using thematic analysis. Coefficient of variation (CV) measure was also used to determine the level of variance that occurs in tenders for conservation projects. Findings – The study found that contractors faced difficulty in pricing competitively due to the following four factors, namely, uncertain information on the actual work on site, inexperience in conservation construction works, information in the bill of quantities is incomplete and uncertain labour and material cost. The study of 22 tenders also ascertains that there is a high variance among the tenderers for building conservation projects. This is determined by the CV analysis where conservation works has a mean CV of 25.5 per cent as compared to 6.5 per cent for new build works. Research limitations/implications – While the interviews managed to draw out insights into the reasons for the high variance among the tender amounts, a definitive conclusion cannot be drawn on the level of variance in tendering for conservation projects due to the limited data that is available for analysis. Originality/value – The paper offers an insight into the reasons why tenders for conservation projects usually have a higher variance than the norm. Emerald 2016 Article PeerReviewed Yoke Mui, L. and Yahaya, A. and Nabavi, F. (2016) Causes of high variance in building conservation tenders in Malaysia. Structural Survey, 34 (2). pp. 98-116. ISSN 0263-080X http://dx.doi.org/10.1108/SS-04-2015-0023 doi:10.1108/SS-04-2015-0023
institution Universiti Malaya
building UM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaya
content_source UM Research Repository
url_provider http://eprints.um.edu.my/
topic TH Building construction
spellingShingle TH Building construction
Yoke Mui, L.
Yahaya, A.
Nabavi, F.
Causes of high variance in building conservation tenders in Malaysia
description Purpose – The purpose of this paper is to identify the reasons for the variance among tenders for conservation projects in Malaysia. Design/methodology/approach – Semi-structured interview approach was adopted because this method allows for effective probing of issues. The interviews are conducted with experienced conservation contractors. The interviews are transcribed and the data are analysed using thematic analysis. Coefficient of variation (CV) measure was also used to determine the level of variance that occurs in tenders for conservation projects. Findings – The study found that contractors faced difficulty in pricing competitively due to the following four factors, namely, uncertain information on the actual work on site, inexperience in conservation construction works, information in the bill of quantities is incomplete and uncertain labour and material cost. The study of 22 tenders also ascertains that there is a high variance among the tenderers for building conservation projects. This is determined by the CV analysis where conservation works has a mean CV of 25.5 per cent as compared to 6.5 per cent for new build works. Research limitations/implications – While the interviews managed to draw out insights into the reasons for the high variance among the tender amounts, a definitive conclusion cannot be drawn on the level of variance in tendering for conservation projects due to the limited data that is available for analysis. Originality/value – The paper offers an insight into the reasons why tenders for conservation projects usually have a higher variance than the norm.
format Article
author Yoke Mui, L.
Yahaya, A.
Nabavi, F.
author_facet Yoke Mui, L.
Yahaya, A.
Nabavi, F.
author_sort Yoke Mui, L.
title Causes of high variance in building conservation tenders in Malaysia
title_short Causes of high variance in building conservation tenders in Malaysia
title_full Causes of high variance in building conservation tenders in Malaysia
title_fullStr Causes of high variance in building conservation tenders in Malaysia
title_full_unstemmed Causes of high variance in building conservation tenders in Malaysia
title_sort causes of high variance in building conservation tenders in malaysia
publisher Emerald
publishDate 2016
url http://eprints.um.edu.my/18771/
http://dx.doi.org/10.1108/SS-04-2015-0023
_version_ 1643690791387791360
score 13.18916