Impacts of common components in multistage production system under uncertain conditions
The work desires: i) to determine the optimum level of batch size in bottleneck facility and ii) to analyze the effect of common components on work-in-process (WIP) level and cycle time in a multistage production system under uncertainties. The uncertainty is created by machine breakdown and qualit...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://eprints.um.edu.my/11274/1/161_wazed.pdf http://eprints.um.edu.my/11274/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|