Impacts of common components in multistage production system under uncertain conditions
The work desires: i) to determine the optimum level of batch size in bottleneck facility and ii) to analyze the effect of common components on work-in-process (WIP) level and cycle time in a multistage production system under uncertainties. The uncertainty is created by machine breakdown and qualit...
Saved in:
Main Authors: | , , |
---|---|
格式: | Conference or Workshop Item |
語言: | English |
出版: |
2010
|
主題: | |
在線閱讀: | http://eprints.um.edu.my/11274/1/161_wazed.pdf http://eprints.um.edu.my/11274/ |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|