Processes Involved In Construction Project Planning

Project planning is essential to a construction project. It has been identified as one of the critical success factors for a construction project. However, most of the local main contractors are not equipped with the knowledge and skills related to the project planning processes. The main objective...

Full description

Saved in:
Bibliographic Details
Main Authors: Zakaria, N., Mohammed, A.H., Kamaruddin, T.
Format: Conference or Workshop Item
Language:English
Published: 2009
Subjects:
Online Access:http://eprints.um.edu.my/10030/1/01IntEC2009.pdf
http://eprints.um.edu.my/10030/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.um.eprints.10030
record_format eprints
spelling my.um.eprints.100302014-12-10T07:39:12Z http://eprints.um.edu.my/10030/ Processes Involved In Construction Project Planning Zakaria, N. Mohammed, A.H. Kamaruddin, T. TA Engineering (General). Civil engineering (General) Project planning is essential to a construction project. It has been identified as one of the critical success factors for a construction project. However, most of the local main contractors are not equipped with the knowledge and skills related to the project planning processes. The main objective of this study is to investigate the processes involved in the preparation of construction project planning. A questionnaire survey was conducted to achieve the objectives of the study. Data analysis was performed by using the established statistical software that is Statistical Package for Social Science (SPSS). The processes involved in the preparation of construction project planning have been identified and ranked accordingly. Results show that twenty processes are involved in the preparation of construction project planning by the contractors as follows; identify client’s requirement, determine project objective, determine scope of work, determine strategic and tactic for execution the project, produce hierarchy of project’s organization for all parties involved, determine activities and prepare work breakdown structure, determine task and responsibility for each activity, identify project duration, identify sequence of activities, identify duration, identify resources, identify cost, identify early start and late finish for each activity, co-ordinate sequence of activity duration, resources, cost early start and late finish, prepare schedule of work, prepare budget, supervise and control the prepared schedule, select and supervise selected sub-contractors, prepare project summary and analyze project risk. Based on these results,project planning evaluation model will be developed and will be validated. 2009 Conference or Workshop Item PeerReviewed application/pdf en http://eprints.um.edu.my/10030/1/01IntEC2009.pdf Zakaria, N. and Mohammed, A.H. and Kamaruddin, T. (2009) Processes Involved In Construction Project Planning. In: International Engineering Convention, 11-14 May 2009, Damascus, Syria.. (Submitted)
institution Universiti Malaya
building UM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaya
content_source UM Research Repository
url_provider http://eprints.um.edu.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Zakaria, N.
Mohammed, A.H.
Kamaruddin, T.
Processes Involved In Construction Project Planning
description Project planning is essential to a construction project. It has been identified as one of the critical success factors for a construction project. However, most of the local main contractors are not equipped with the knowledge and skills related to the project planning processes. The main objective of this study is to investigate the processes involved in the preparation of construction project planning. A questionnaire survey was conducted to achieve the objectives of the study. Data analysis was performed by using the established statistical software that is Statistical Package for Social Science (SPSS). The processes involved in the preparation of construction project planning have been identified and ranked accordingly. Results show that twenty processes are involved in the preparation of construction project planning by the contractors as follows; identify client’s requirement, determine project objective, determine scope of work, determine strategic and tactic for execution the project, produce hierarchy of project’s organization for all parties involved, determine activities and prepare work breakdown structure, determine task and responsibility for each activity, identify project duration, identify sequence of activities, identify duration, identify resources, identify cost, identify early start and late finish for each activity, co-ordinate sequence of activity duration, resources, cost early start and late finish, prepare schedule of work, prepare budget, supervise and control the prepared schedule, select and supervise selected sub-contractors, prepare project summary and analyze project risk. Based on these results,project planning evaluation model will be developed and will be validated.
format Conference or Workshop Item
author Zakaria, N.
Mohammed, A.H.
Kamaruddin, T.
author_facet Zakaria, N.
Mohammed, A.H.
Kamaruddin, T.
author_sort Zakaria, N.
title Processes Involved In Construction Project Planning
title_short Processes Involved In Construction Project Planning
title_full Processes Involved In Construction Project Planning
title_fullStr Processes Involved In Construction Project Planning
title_full_unstemmed Processes Involved In Construction Project Planning
title_sort processes involved in construction project planning
publishDate 2009
url http://eprints.um.edu.my/10030/1/01IntEC2009.pdf
http://eprints.um.edu.my/10030/
_version_ 1643688689265541120
score 13.159267