The determination of productivity index in construction process / Amlan Yunus
Labor productivity is defined as the input divided by the output, and is calculated for a finite time interval the following way: Labor Productivity = Manhours/Units of Work It is commonly called the unit rate. The need for a standardized approach for measuring construction task-level labor producti...
Saved in:
Main Author: | Yunus, Amlan |
---|---|
Format: | Thesis |
Language: | English |
Published: |
1990
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/99749/1/99749.pdf https://ir.uitm.edu.my/id/eprint/99749/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The determination of labour constant (productivity index) for construction process formwork / Roslan Painudy
by: Painudy, Roslan
Published: (1991) -
The determinants of foreign labor entry in Malaysia / Zulhilmi Shafie
by: Shafie, Zulhilmi
Published: (2020) -
Determinants of financial well-being among emerging adults workers in Malaysia: the mediating effect of financial behavior / Mohd Samsuri Ghazali
by: Ghazali, Mohd Samsuri
Published: (2022) -
The relationship between workplace environments and
the level of employees productivity at
Pejabat Setiausaha Kerajaan Pahang / Faizatul Akma Hamzah
by: Hamzah, Faizatul Akma
Published: (2017) -
The impact of labor force on productivity: a case study of Pejabat Daerah Dan Tanah Seberang Perai Tengah / Nurshawati Che’mat
by: Che’mat, Nurshawati
Published: (2021)