Factors contributing to progress payment problems in Malaysian construction projects / Nurul Izzati Abdul Halim and Nor Suzila Lop
Payment like interim payment is the most important in construction projects because it is the lifeblood that keeps the project operating efficiently. Timely and accurate payments are necessary to maintain a good cash flow, allowing contractors to meet their financial obligations to pay workers. Howe...
Saved in:
Main Authors: | Abdul Halim, Nurul Izzati, Lop, Nor Suzila |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2023
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/99695/1/99695.pdf https://ir.uitm.edu.my/id/eprint/99695/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A systematic review on the use of GIS in real estate valuation / Nur Izzati Ridzuan and Mohamad Haizam Mohamed Saraf
by: Ridzuan, Nur Izzati, et al.
Published: (2023) -
A comparative study of penalty or levy implementation at state level in Peninsular Malaysia / Nurul Azreen Syamira Azlan and Nor Azalina Yusnita Abdul Rahman
by: Azlan, Nurul Azreen Syamira, et al.
Published: (2023) -
The factors contributing to construction cost overruns in Perak / Muhammad Farhan Mansor and Mohamad Haszirul Mohd Hashim
by: Mansor, Muhammad Farhan, et al.
Published: (2023) -
Developing framework Life Cycle Cost (LCC) components to energy performance in green office buildings / Nurul Afiqah Yunus
by: Yunus, Nurul Afiqah
Published: (2022) -
A study on quality control during construction / Mohd Syahrizam Mahamad
by: Mahamad, Mohd Syahrizam
Published: (2002)