Construction, testing and commissioning of a 60 kV double stage Marx Generator / Ahmad Nazari Mai

The main objective of this project is to complete the construction work of a 60 kV Multistage Marx Generator with a waveshape of 4/400 n sec, for the proposed High Voltage Engineering Laboratory in die Department of Electrical Engineering, ITM Shah Alam. The Marx Generator is basically applied a met...

Full description

Saved in:
Bibliographic Details
Main Author: Mai, Ahmad Nazari
Format: Thesis
Language:English
Published: 1995
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/99611/1/99611.pdf
https://ir.uitm.edu.my/id/eprint/99611/
Tags: Add Tag
No Tags, Be the first to tag this record!