Construction, testing and commissioning of a 60 kV double stage Marx Generator / Ahmad Nazari Mai
The main objective of this project is to complete the construction work of a 60 kV Multistage Marx Generator with a waveshape of 4/400 n sec, for the proposed High Voltage Engineering Laboratory in die Department of Electrical Engineering, ITM Shah Alam. The Marx Generator is basically applied a met...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
1995
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/99611/1/99611.pdf https://ir.uitm.edu.my/id/eprint/99611/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|