Construction method of pre-boring works and spun pile installation at PTD 182919, Bukit Indah, Johor Bahru / Wan Mohd Danial Wan Najmi

Piling is mainly known in a deep foundation category that is designed specially to transfer all type of load inside superstructure to the deepest bed of soil. Spun pile and reinforcement concrete piles are one of the common piles used and designed with numbers of methods by using many formulas. With...

Full description

Saved in:
Bibliographic Details
Main Author: Wan Najmi, Wan Mohd Danial
Format: Monograph
Language:English
Published: Universiti Teknologi MARA, Perak 2019
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/99301/1/99301.pdf
https://ir.uitm.edu.my/id/eprint/99301/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Piling is mainly known in a deep foundation category that is designed specially to transfer all type of load inside superstructure to the deepest bed of soil. Spun pile and reinforcement concrete piles are one of the common piles used and designed with numbers of methods by using many formulas. With these installations of deep foundation, there are also few methods of construction conducted. The main objective of this case study is to identify the method construction for pre-boring and installation of spun pile, investigate the relationship of pile driver analyzer with piles installed, and to identify the hazards occur during the construction. The installation and method used for this deep foundation installation is also conducted and approved with tolerance and its designed working load capacity.