The barriers of Industrialisation Building Sytem (IBS) adoption in Malaysian construction industry / Nursuhanis Bahadun and Nurul Huda Muhamad
Industrialized Building Systems (IBS)refer to various pre-fabricated construction methods. IBS components are constructed separately beforehand, and they are assembled on-site afterwards. In Malaysia, IBS has improved building quality, productivity, occupational safety and health concerns, and reduc...
Saved in:
Main Authors: | Bahadun, Nursuhanis, Muhamad, Nurul Huda |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2023
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/98865/1/98865.pdf https://ir.uitm.edu.my/id/eprint/98865/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Critical success factors and barriers for industrialised building system (IBS) adoption in construction project
by: Suhaida Noorein, Iskandar Mirza
Published: (2010) -
IBS survey 2010: Drivers, barriers and critical success factors in adopting industrialised building system (IBS) construction by G7 contractors in Malaysia
by: Mohamad Kamar, Kamarul Anuar, et al.
Published: (2014) -
Installation of precast column and beam (Industrialised Building System) / Nur Syakira Huda Radzi
by: Radzi, Nur Syakira Huda
Published: (2018) -
Flexibility supply chain in Industrialised Building System (IBS)
by: Kassim, Umar, et al.
Published: (2013) -
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013)