Construction method of leachate water collection drain / Nur Najwa Natasya Muhamad Nasri
Leachate Water Collection Drain is a new system introduced in Lynas Advanced Material Plant (LAMP) and the most crucial part in Lynas Malaysia Sdn. Bhd. residue waste management, thus this report was mainly to discuss how this collection drain functioning based on engineering design and theory. The...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA, Perak
2019
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/98382/1/98382.pdf https://ir.uitm.edu.my/id/eprint/98382/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.98382 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.983822024-08-04T14:06:10Z https://ir.uitm.edu.my/id/eprint/98382/ Construction method of leachate water collection drain / Nur Najwa Natasya Muhamad Nasri Mohamad Nasri, Nur Najwa Natasya Building fittings and their installation Leachate Water Collection Drain is a new system introduced in Lynas Advanced Material Plant (LAMP) and the most crucial part in Lynas Malaysia Sdn. Bhd. residue waste management, thus this report was mainly to discuss how this collection drain functioning based on engineering design and theory. The aim of this report was to monitor the construction of this waste pond for waste residue dumping area in Lynas' waste management process stage. The objective of this report is to explain the method of construction of Leachate Water Collection Drain as the correct erection will give the efficient functioning to the collection drain system and good accommodation for the tons of loaded waste. In addition, to identify the benefits of Leachate Water Collection Drain especially to the environment prevented wastewater absorption into the underground soil. This report had been done through interviews to collect varieties of information from the experienced party along with observations recorded and photographs as evidence. From this report, we will find out the sequence of work needed to successfully construct the Leachate Water Collection Drain. Universiti Teknologi MARA, Perak 2019 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/98382/1/98382.pdf Construction method of leachate water collection drain / Nur Najwa Natasya Muhamad Nasri. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted) |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Building fittings and their installation |
spellingShingle |
Building fittings and their installation Mohamad Nasri, Nur Najwa Natasya Construction method of leachate water collection drain / Nur Najwa Natasya Muhamad Nasri |
description |
Leachate Water Collection Drain is a new system introduced in Lynas Advanced Material Plant (LAMP) and the most crucial part in Lynas Malaysia Sdn. Bhd. residue waste management, thus this report was mainly to discuss how this collection drain functioning based on engineering design and theory. The aim of this report was to monitor the construction of this waste pond for waste residue dumping area in Lynas' waste management process stage. The objective of this report is to explain the method of construction of Leachate Water Collection Drain as the correct erection will give the efficient functioning to the collection drain system and good accommodation for the tons of loaded waste. In addition, to identify the benefits of Leachate Water Collection Drain especially to the environment prevented wastewater absorption into the underground soil. This report had been done through interviews to collect varieties of information from the experienced party along with observations recorded and photographs as evidence. From this report, we will find out the sequence of work needed to successfully construct the Leachate Water Collection Drain. |
format |
Monograph |
author |
Mohamad Nasri, Nur Najwa Natasya |
author_facet |
Mohamad Nasri, Nur Najwa Natasya |
author_sort |
Mohamad Nasri, Nur Najwa Natasya |
title |
Construction method of leachate water collection drain / Nur Najwa Natasya Muhamad Nasri |
title_short |
Construction method of leachate water collection drain / Nur Najwa Natasya Muhamad Nasri |
title_full |
Construction method of leachate water collection drain / Nur Najwa Natasya Muhamad Nasri |
title_fullStr |
Construction method of leachate water collection drain / Nur Najwa Natasya Muhamad Nasri |
title_full_unstemmed |
Construction method of leachate water collection drain / Nur Najwa Natasya Muhamad Nasri |
title_sort |
construction method of leachate water collection drain / nur najwa natasya muhamad nasri |
publisher |
Universiti Teknologi MARA, Perak |
publishDate |
2019 |
url |
https://ir.uitm.edu.my/id/eprint/98382/1/98382.pdf https://ir.uitm.edu.my/id/eprint/98382/ |
_version_ |
1806517535246385152 |
score |
13.18916 |