Construction method of leachate water collection drain / Nur Najwa Natasya Muhamad Nasri

Leachate Water Collection Drain is a new system introduced in Lynas Advanced Material Plant (LAMP) and the most crucial part in Lynas Malaysia Sdn. Bhd. residue waste management, thus this report was mainly to discuss how this collection drain functioning based on engineering design and theory. The...

Full description

Saved in:
Bibliographic Details
Main Author: Mohamad Nasri, Nur Najwa Natasya
Format: Monograph
Language:English
Published: Universiti Teknologi MARA, Perak 2019
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/98382/1/98382.pdf
https://ir.uitm.edu.my/id/eprint/98382/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.98382
record_format eprints
spelling my.uitm.ir.983822024-08-04T14:06:10Z https://ir.uitm.edu.my/id/eprint/98382/ Construction method of leachate water collection drain / Nur Najwa Natasya Muhamad Nasri Mohamad Nasri, Nur Najwa Natasya Building fittings and their installation Leachate Water Collection Drain is a new system introduced in Lynas Advanced Material Plant (LAMP) and the most crucial part in Lynas Malaysia Sdn. Bhd. residue waste management, thus this report was mainly to discuss how this collection drain functioning based on engineering design and theory. The aim of this report was to monitor the construction of this waste pond for waste residue dumping area in Lynas' waste management process stage. The objective of this report is to explain the method of construction of Leachate Water Collection Drain as the correct erection will give the efficient functioning to the collection drain system and good accommodation for the tons of loaded waste. In addition, to identify the benefits of Leachate Water Collection Drain especially to the environment prevented wastewater absorption into the underground soil. This report had been done through interviews to collect varieties of information from the experienced party along with observations recorded and photographs as evidence. From this report, we will find out the sequence of work needed to successfully construct the Leachate Water Collection Drain. Universiti Teknologi MARA, Perak 2019 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/98382/1/98382.pdf Construction method of leachate water collection drain / Nur Najwa Natasya Muhamad Nasri. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Building fittings and their installation
spellingShingle Building fittings and their installation
Mohamad Nasri, Nur Najwa Natasya
Construction method of leachate water collection drain / Nur Najwa Natasya Muhamad Nasri
description Leachate Water Collection Drain is a new system introduced in Lynas Advanced Material Plant (LAMP) and the most crucial part in Lynas Malaysia Sdn. Bhd. residue waste management, thus this report was mainly to discuss how this collection drain functioning based on engineering design and theory. The aim of this report was to monitor the construction of this waste pond for waste residue dumping area in Lynas' waste management process stage. The objective of this report is to explain the method of construction of Leachate Water Collection Drain as the correct erection will give the efficient functioning to the collection drain system and good accommodation for the tons of loaded waste. In addition, to identify the benefits of Leachate Water Collection Drain especially to the environment prevented wastewater absorption into the underground soil. This report had been done through interviews to collect varieties of information from the experienced party along with observations recorded and photographs as evidence. From this report, we will find out the sequence of work needed to successfully construct the Leachate Water Collection Drain.
format Monograph
author Mohamad Nasri, Nur Najwa Natasya
author_facet Mohamad Nasri, Nur Najwa Natasya
author_sort Mohamad Nasri, Nur Najwa Natasya
title Construction method of leachate water collection drain / Nur Najwa Natasya Muhamad Nasri
title_short Construction method of leachate water collection drain / Nur Najwa Natasya Muhamad Nasri
title_full Construction method of leachate water collection drain / Nur Najwa Natasya Muhamad Nasri
title_fullStr Construction method of leachate water collection drain / Nur Najwa Natasya Muhamad Nasri
title_full_unstemmed Construction method of leachate water collection drain / Nur Najwa Natasya Muhamad Nasri
title_sort construction method of leachate water collection drain / nur najwa natasya muhamad nasri
publisher Universiti Teknologi MARA, Perak
publishDate 2019
url https://ir.uitm.edu.my/id/eprint/98382/1/98382.pdf
https://ir.uitm.edu.my/id/eprint/98382/
_version_ 1806517535246385152
score 13.18916