Defect studies during defect liability period / Muhammad Aliff Imran Suardi

Defect Liability Period (DLP) is essential in every building as the warranty of the building. It is also the period a contractor is liable to make good the defects. Therefore, the aims and purposes of this report was to identify the types of defects in a building and to investigate the problems and...

Full description

Saved in:
Bibliographic Details
Main Author: Suardi, Muhammad Aliff Imran
Format: Monograph
Language:English
Published: Universiti Teknologi MARA, Perak 2019
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/97699/1/97699.pdf
https://ir.uitm.edu.my/id/eprint/97699/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.97699
record_format eprints
spelling my.uitm.ir.976992024-08-28T01:58:40Z https://ir.uitm.edu.my/id/eprint/97699/ Defect studies during defect liability period / Muhammad Aliff Imran Suardi Suardi, Muhammad Aliff Imran Building failures, errors, defects, etc. Defect Liability Period (DLP) is essential in every building as the warranty of the building. It is also the period a contractor is liable to make good the defects. Therefore, the aims and purposes of this report was to identify the types of defects in a building and to investigate the problems and solutions of every defect in this building. It was conducted at Avisena Women's and Children's Specialist Hospital. This report also will focus on all the works related to how to prevent defects in a building. As a result, the building will mainly be safe from any hazards in the future. In conclusion, DLP was shown to be an important role in a contract to keep a building safe. Universiti Teknologi MARA, Perak 2019 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/97699/1/97699.pdf Defect studies during defect liability period / Muhammad Aliff Imran Suardi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Building failures, errors, defects, etc.
spellingShingle Building failures, errors, defects, etc.
Suardi, Muhammad Aliff Imran
Defect studies during defect liability period / Muhammad Aliff Imran Suardi
description Defect Liability Period (DLP) is essential in every building as the warranty of the building. It is also the period a contractor is liable to make good the defects. Therefore, the aims and purposes of this report was to identify the types of defects in a building and to investigate the problems and solutions of every defect in this building. It was conducted at Avisena Women's and Children's Specialist Hospital. This report also will focus on all the works related to how to prevent defects in a building. As a result, the building will mainly be safe from any hazards in the future. In conclusion, DLP was shown to be an important role in a contract to keep a building safe.
format Monograph
author Suardi, Muhammad Aliff Imran
author_facet Suardi, Muhammad Aliff Imran
author_sort Suardi, Muhammad Aliff Imran
title Defect studies during defect liability period / Muhammad Aliff Imran Suardi
title_short Defect studies during defect liability period / Muhammad Aliff Imran Suardi
title_full Defect studies during defect liability period / Muhammad Aliff Imran Suardi
title_fullStr Defect studies during defect liability period / Muhammad Aliff Imran Suardi
title_full_unstemmed Defect studies during defect liability period / Muhammad Aliff Imran Suardi
title_sort defect studies during defect liability period / muhammad aliff imran suardi
publisher Universiti Teknologi MARA, Perak
publishDate 2019
url https://ir.uitm.edu.my/id/eprint/97699/1/97699.pdf
https://ir.uitm.edu.my/id/eprint/97699/
_version_ 1808976004809490432
score 13.19449