Driving impact of delay in construction project / Muhammad Khairul Khusyairi Rusni and Syed Abdul Haris Syed Mustapa
This thesis examines the factors contributing to delays in construction projects and their impacts on project outcomes. Construction projects often face challenges and delays that significantly impact project schedules, costs, and client satisfaction. Understanding these factors and their consequenc...
Saved in:
Main Authors: | Rusni, Muhammad Khairul Khusyairi, Syed Mustapa, Syed Abdul Haris |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2023
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/97174/1/97174.pdf https://ir.uitm.edu.my/id/eprint/97174/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Factors causing variation orders of mosque construction in Perak, Malaysia: a case study / Mohd Nazri Abdullah and Syed Haris Syed Mustapa
by: Abdullah, Mohd Nazri, et al.
Published: (2021) -
Work culture of Building Information Modeling (BIM) in the Malaysian Construction Industry / Abdul Muhaimin Zakaria and Syed Ahmad Qusoiri Syed Abdul Karim
by: Zakaria, Abdul Muhaimin, et al.
Published: (2020) -
Barriers faced by the workers to practice health and safety at construction sites / Sharifah Nur’Ain Sufiah Syed Ali Sabri and Mohd Hafiz Saberi
by: Syed Ali Sabri, Sharifah Nur’Ain Sufiah, et al.
Published: (2023) -
Key factors that affecting the well-being of construction labour during COVID-19 pandemic / Nurul Amalin Iwana Yuziman and Syarifah Nur Nazihah Syed Jamalulil
by: Yuziman, Nurul Amalin Iwana, et al.
Published: (2023) -
Construction labour’s productivity indicator to the project success: a literature review / Syarifah Nur Nazihah Syed Jamalulil ... [et al.]
by: Syed Jamalulil, Syarifah Nur Nazihah, et al.
Published: (2022)