The factors contributing to construction cost overruns in Perak / Muhammad Farhan Mansor and Mohamad Haszirul Mohd Hashim

Cost increase has severely hit down the economy and reputations for many constructions industry around the world. Thus, this paper aims to identify and cluster the potential construction project cost increase factors. Basically, through literature review, all the potential factors that may cause cos...

Full description

Saved in:
Bibliographic Details
Main Authors: Mansor, Muhammad Farhan, Mohd Hashim, Mohamad Haszirul
Format: Conference or Workshop Item
Language:English
Published: 2023
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/97108/1/97108.pdf
https://ir.uitm.edu.my/id/eprint/97108/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.97108
record_format eprints
spelling my.uitm.ir.971082024-09-03T13:54:02Z https://ir.uitm.edu.my/id/eprint/97108/ The factors contributing to construction cost overruns in Perak / Muhammad Farhan Mansor and Mohamad Haszirul Mohd Hashim Mansor, Muhammad Farhan Mohd Hashim, Mohamad Haszirul Estimates. Measurements. Quantities and cost Cost increase has severely hit down the economy and reputations for many constructions industry around the world. Thus, this paper aims to identify and cluster the potential construction project cost increase factors. Basically, through literature review, all the potential factors that may cause cost increase were screened thoroughly before they were clustered into of the originating factors, namely project, contract, client, contractor. Meanwhile, the predominant causes of cost increase were poor preconstruction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost increases for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants. The study identifies cost increase in construction industry and purpose of the finding to allowed recommendations to be made regarding budget management in building construction based on contractor view.The analysis of the responses reveals interesting insights regarding the impact of improper planning in construction on increasing costs. The analysis indicates that a significant majority of respondents recognize the correlation between improper planning in construction and an increasing cost. 2023-10 Conference or Workshop Item PeerReviewed text en https://ir.uitm.edu.my/id/eprint/97108/1/97108.pdf The factors contributing to construction cost overruns in Perak / Muhammad Farhan Mansor and Mohamad Haszirul Mohd Hashim. (2023) In: UNSPECIFIED.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Estimates. Measurements. Quantities and cost
spellingShingle Estimates. Measurements. Quantities and cost
Mansor, Muhammad Farhan
Mohd Hashim, Mohamad Haszirul
The factors contributing to construction cost overruns in Perak / Muhammad Farhan Mansor and Mohamad Haszirul Mohd Hashim
description Cost increase has severely hit down the economy and reputations for many constructions industry around the world. Thus, this paper aims to identify and cluster the potential construction project cost increase factors. Basically, through literature review, all the potential factors that may cause cost increase were screened thoroughly before they were clustered into of the originating factors, namely project, contract, client, contractor. Meanwhile, the predominant causes of cost increase were poor preconstruction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost increases for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants. The study identifies cost increase in construction industry and purpose of the finding to allowed recommendations to be made regarding budget management in building construction based on contractor view.The analysis of the responses reveals interesting insights regarding the impact of improper planning in construction on increasing costs. The analysis indicates that a significant majority of respondents recognize the correlation between improper planning in construction and an increasing cost.
format Conference or Workshop Item
author Mansor, Muhammad Farhan
Mohd Hashim, Mohamad Haszirul
author_facet Mansor, Muhammad Farhan
Mohd Hashim, Mohamad Haszirul
author_sort Mansor, Muhammad Farhan
title The factors contributing to construction cost overruns in Perak / Muhammad Farhan Mansor and Mohamad Haszirul Mohd Hashim
title_short The factors contributing to construction cost overruns in Perak / Muhammad Farhan Mansor and Mohamad Haszirul Mohd Hashim
title_full The factors contributing to construction cost overruns in Perak / Muhammad Farhan Mansor and Mohamad Haszirul Mohd Hashim
title_fullStr The factors contributing to construction cost overruns in Perak / Muhammad Farhan Mansor and Mohamad Haszirul Mohd Hashim
title_full_unstemmed The factors contributing to construction cost overruns in Perak / Muhammad Farhan Mansor and Mohamad Haszirul Mohd Hashim
title_sort factors contributing to construction cost overruns in perak / muhammad farhan mansor and mohamad haszirul mohd hashim
publishDate 2023
url https://ir.uitm.edu.my/id/eprint/97108/1/97108.pdf
https://ir.uitm.edu.my/id/eprint/97108/
_version_ 1811596750662664192
score 13.2014675