Piles are designed to transfer any dead or live load of superstructure to the deepest state of soil. Reinforcement concrete piles or RC piles are one of the common piles use and design by many analyses and using many formulas. But due to the uncertainties of problems such as soil behaviour, these pi...

Full description

Saved in:
Bibliographic Details
Main Author: Alwi, Nur Erisha Emalin
Format: Monograph
Language:English
Published: Universiti Teknologi MARA, Perak 2019
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/97083/1/97083.pdf
https://ir.uitm.edu.my/id/eprint/97083/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.97083
record_format eprints
spelling my.uitm.ir.970832024-08-18T09:03:54Z https://ir.uitm.edu.my/id/eprint/97083/ Method and procedure of pile load test in PTD 182919, Bukit lndah, Iskandar Puteri, Johor / Nur Erisha Emalin Alwi Alwi, Nur Erisha Emalin Building fittings and their installation Piles are designed to transfer any dead or live load of superstructure to the deepest state of soil. Reinforcement concrete piles or RC piles are one of the common piles use and design by many analyses and using many formulas. But due to the uncertainties of problems such as soil behaviour, these piles need to be tested using several tests such as maintain load test to identify the strength of the pile. A case study of maintain load test of RC piles is conducted and the data and result are collected through settlement curves. The main objective of this case study is to determine the method construction for maintaining load test, time taken to complete the test and to determine the hazard occur during the test conducted. The findings show a method of test pile is constructed and been observed the load. Universiti Teknologi MARA, Perak 2019 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/97083/1/97083.pdf Method and procedure of pile load test in PTD 182919, Bukit lndah, Iskandar Puteri, Johor / Nur Erisha Emalin Alwi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Building fittings and their installation
spellingShingle Building fittings and their installation
Alwi, Nur Erisha Emalin
Method and procedure of pile load test in PTD 182919, Bukit lndah, Iskandar Puteri, Johor / Nur Erisha Emalin Alwi
description Piles are designed to transfer any dead or live load of superstructure to the deepest state of soil. Reinforcement concrete piles or RC piles are one of the common piles use and design by many analyses and using many formulas. But due to the uncertainties of problems such as soil behaviour, these piles need to be tested using several tests such as maintain load test to identify the strength of the pile. A case study of maintain load test of RC piles is conducted and the data and result are collected through settlement curves. The main objective of this case study is to determine the method construction for maintaining load test, time taken to complete the test and to determine the hazard occur during the test conducted. The findings show a method of test pile is constructed and been observed the load.
format Monograph
author Alwi, Nur Erisha Emalin
author_facet Alwi, Nur Erisha Emalin
author_sort Alwi, Nur Erisha Emalin
title Method and procedure of pile load test in PTD 182919, Bukit lndah, Iskandar Puteri, Johor / Nur Erisha Emalin Alwi
title_short Method and procedure of pile load test in PTD 182919, Bukit lndah, Iskandar Puteri, Johor / Nur Erisha Emalin Alwi
title_full Method and procedure of pile load test in PTD 182919, Bukit lndah, Iskandar Puteri, Johor / Nur Erisha Emalin Alwi
title_fullStr Method and procedure of pile load test in PTD 182919, Bukit lndah, Iskandar Puteri, Johor / Nur Erisha Emalin Alwi
title_full_unstemmed Method and procedure of pile load test in PTD 182919, Bukit lndah, Iskandar Puteri, Johor / Nur Erisha Emalin Alwi
title_sort method and procedure of pile load test in ptd 182919, bukit lndah, iskandar puteri, johor / nur erisha emalin alwi
publisher Universiti Teknologi MARA, Perak
publishDate 2019
url https://ir.uitm.edu.my/id/eprint/97083/1/97083.pdf
https://ir.uitm.edu.my/id/eprint/97083/
_version_ 1808975997696999424
score 13.19449