Requirement for implementation of Rainwater Harvesting System (RWHS) for issuance of certificate of completion and compliance (CCC) / Zairul Azri Zuhairi

This report will look through the requirement for installation of rainwater Harvesting System for freestanding buildings with roof area more than 100 square meter in order for issuance for CCC as part of Selangor’s State Government new policy gazetted on 2011. Rainwater Harvesting System (RWHS) is m...

Full description

Saved in:
Bibliographic Details
Main Author: Zuhairi, Zairul Azri
Format: Monograph
Language:English
Published: Universiti Teknologi MARA UiTM,Perak 2021
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/93767/1/93767.pdf
https://ir.uitm.edu.my/id/eprint/93767/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.93767
record_format eprints
spelling my.uitm.ir.937672024-04-16T04:00:07Z https://ir.uitm.edu.my/id/eprint/93767/ Requirement for implementation of Rainwater Harvesting System (RWHS) for issuance of certificate of completion and compliance (CCC) / Zairul Azri Zuhairi Zuhairi, Zairul Azri TH Building construction Building inspection This report will look through the requirement for installation of rainwater Harvesting System for freestanding buildings with roof area more than 100 square meter in order for issuance for CCC as part of Selangor’s State Government new policy gazetted on 2011. Rainwater Harvesting System (RWHS) is made as mandatory requirement for buildings of certain category in order for the issuance of Certificate of Compliance and Completion (CCC) by Local Authority throughout the State of Selangor. The detail of the categorized building that is declared by the government, the standard or guidelines provided for the system as well as date of enforcement by local authority. This report also contains the details of requirement and enforcement process of RWHS plans and are analyzed thoroughly with reference of the original guideline of the system provided by the Kementerian Kesejahteraan Bandar, Perumahan dan Kerajaan Tempatan (KPKT) in 2011. Next, based on few chosen case studies, the ways of implementation by consultants and owners on site and during planning are examine and recorded as random examples of effectiveness of the new government policy. The method of installation of the RWHS on site are carefully recorded and inspected focusing on the aspect of compliance to the approved plan and functionality of the system. Lastly, problems that arise due to the new policy are analyzed in order to provide best possible solution and recommendation regardless the nature of the problems either technical or general. Universiti Teknologi MARA UiTM,Perak 2021 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/93767/1/93767.pdf Requirement for implementation of Rainwater Harvesting System (RWHS) for issuance of certificate of completion and compliance (CCC) / Zairul Azri Zuhairi. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Building inspection
spellingShingle TH Building construction
Building inspection
Zuhairi, Zairul Azri
Requirement for implementation of Rainwater Harvesting System (RWHS) for issuance of certificate of completion and compliance (CCC) / Zairul Azri Zuhairi
description This report will look through the requirement for installation of rainwater Harvesting System for freestanding buildings with roof area more than 100 square meter in order for issuance for CCC as part of Selangor’s State Government new policy gazetted on 2011. Rainwater Harvesting System (RWHS) is made as mandatory requirement for buildings of certain category in order for the issuance of Certificate of Compliance and Completion (CCC) by Local Authority throughout the State of Selangor. The detail of the categorized building that is declared by the government, the standard or guidelines provided for the system as well as date of enforcement by local authority. This report also contains the details of requirement and enforcement process of RWHS plans and are analyzed thoroughly with reference of the original guideline of the system provided by the Kementerian Kesejahteraan Bandar, Perumahan dan Kerajaan Tempatan (KPKT) in 2011. Next, based on few chosen case studies, the ways of implementation by consultants and owners on site and during planning are examine and recorded as random examples of effectiveness of the new government policy. The method of installation of the RWHS on site are carefully recorded and inspected focusing on the aspect of compliance to the approved plan and functionality of the system. Lastly, problems that arise due to the new policy are analyzed in order to provide best possible solution and recommendation regardless the nature of the problems either technical or general.
format Monograph
author Zuhairi, Zairul Azri
author_facet Zuhairi, Zairul Azri
author_sort Zuhairi, Zairul Azri
title Requirement for implementation of Rainwater Harvesting System (RWHS) for issuance of certificate of completion and compliance (CCC) / Zairul Azri Zuhairi
title_short Requirement for implementation of Rainwater Harvesting System (RWHS) for issuance of certificate of completion and compliance (CCC) / Zairul Azri Zuhairi
title_full Requirement for implementation of Rainwater Harvesting System (RWHS) for issuance of certificate of completion and compliance (CCC) / Zairul Azri Zuhairi
title_fullStr Requirement for implementation of Rainwater Harvesting System (RWHS) for issuance of certificate of completion and compliance (CCC) / Zairul Azri Zuhairi
title_full_unstemmed Requirement for implementation of Rainwater Harvesting System (RWHS) for issuance of certificate of completion and compliance (CCC) / Zairul Azri Zuhairi
title_sort requirement for implementation of rainwater harvesting system (rwhs) for issuance of certificate of completion and compliance (ccc) / zairul azri zuhairi
publisher Universiti Teknologi MARA UiTM,Perak
publishDate 2021
url https://ir.uitm.edu.my/id/eprint/93767/1/93767.pdf
https://ir.uitm.edu.my/id/eprint/93767/
_version_ 1797925401938362368
score 13.15806