Construction of a blower room at PJA 229, Indah Water Konsortium Sdn Bhd / Nurul Najihah Rohaizat

This report briefly describes the machineries and tools used, the calculation and cost of the construction, and process of constructing of a blower room It is produced according to few times site inspection experience at a construction site. The project took two months to finish completely on the co...

Full description

Saved in:
Bibliographic Details
Main Author: Rohaizat, Nurul Najihah
Format: Monograph
Language:English
Published: Universiti Teknologi MARA UiTM,Perak 2021
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/92844/1/92844.PDF
https://ir.uitm.edu.my/id/eprint/92844/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This report briefly describes the machineries and tools used, the calculation and cost of the construction, and process of constructing of a blower room It is produced according to few times site inspection experience at a construction site. The project took two months to finish completely on the construction side of the building. The objective of this report is to investigate the calculation and cost of the construction, to list the machineries and tools used in the project and to illustrate the process of constructing a blower room. In this report, there are two types of study method which is observation and interview method. Observation method is performed by do a site visit. Meanwhile, interviews were conducted with site supervisor of this project. The finding from this report is the construction of blower which it is started from setting out, excavation, foundation, installation of pipe, plinth beam and slab, superstructure, brick masonry work, installation of roof and lastly finishing. During this construction, changes in weather that are momentarily sunny and sometimes rainy caused the construction process to be somewhat disrupted. However, this blower room can be completed successfully on 28th November 2021.