Brickwork / Nurul Asyura Md Zaini

This report briefly describes the method of brickwork, equipment and tool used in brickwork and precautions step in brickwork. It is produced according to supervised the brickwork at the bungalow construction site. The objective of this report is to identify the method of brickwork, the tools and eq...

Full description

Saved in:
Bibliographic Details
Main Author: Md Zaini, Nurul Asyura
Format: Monograph
Language:English
Published: Universiti Teknologi MARA UiTM,Perak 2022
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/92466/1/92466.PDF
https://ir.uitm.edu.my/id/eprint/92466/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.92466
record_format eprints
spelling my.uitm.ir.924662024-03-15T08:24:41Z https://ir.uitm.edu.my/id/eprint/92466/ Brickwork / Nurul Asyura Md Zaini Md Zaini, Nurul Asyura Construction details. Including foundations, maintenance, equipment TH Building construction This report briefly describes the method of brickwork, equipment and tool used in brickwork and precautions step in brickwork. It is produced according to supervised the brickwork at the bungalow construction site. The objective of this report is to identify the method of brickwork, the tools and equipment of brickwork and to identify the precautions step in brickwork. In this report, there are primary method of study used to gain the information on method, equipment and precautions in brickwork is based on observation, interview and document review. Observation has been made by supervise on the brickwork. Interviewed the manager who is more experienced resulting more information. Document review like studying the Bungalow Plan. The finding from this case study is the method of brickwork which start from setting out, cleaning, marking, mortar mixing, installation of Damp-Proof Course (DPC), bricklaying process until installation of lintels and frames. The tools and equipment used in brickwork is concrete mixer, wheel barrow, trowel, scaffolding, bucket, thread, nails, shovel, spirit level and hammer. The precautions step in brickwork is wear respiration protective, installation of scaffolding properly, wear covered cloth and glove and safety boat. Hope this report can give a lot of advantages and benefits to the reader on how the method of brickwork, tools and equipment used in brickwork and also the precautions step in brickwork. Universiti Teknologi MARA UiTM,Perak 2022 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/92466/1/92466.PDF Brickwork / Nurul Asyura Md Zaini. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Construction details. Including foundations, maintenance, equipment
TH Building construction
spellingShingle Construction details. Including foundations, maintenance, equipment
TH Building construction
Md Zaini, Nurul Asyura
Brickwork / Nurul Asyura Md Zaini
description This report briefly describes the method of brickwork, equipment and tool used in brickwork and precautions step in brickwork. It is produced according to supervised the brickwork at the bungalow construction site. The objective of this report is to identify the method of brickwork, the tools and equipment of brickwork and to identify the precautions step in brickwork. In this report, there are primary method of study used to gain the information on method, equipment and precautions in brickwork is based on observation, interview and document review. Observation has been made by supervise on the brickwork. Interviewed the manager who is more experienced resulting more information. Document review like studying the Bungalow Plan. The finding from this case study is the method of brickwork which start from setting out, cleaning, marking, mortar mixing, installation of Damp-Proof Course (DPC), bricklaying process until installation of lintels and frames. The tools and equipment used in brickwork is concrete mixer, wheel barrow, trowel, scaffolding, bucket, thread, nails, shovel, spirit level and hammer. The precautions step in brickwork is wear respiration protective, installation of scaffolding properly, wear covered cloth and glove and safety boat. Hope this report can give a lot of advantages and benefits to the reader on how the method of brickwork, tools and equipment used in brickwork and also the precautions step in brickwork.
format Monograph
author Md Zaini, Nurul Asyura
author_facet Md Zaini, Nurul Asyura
author_sort Md Zaini, Nurul Asyura
title Brickwork / Nurul Asyura Md Zaini
title_short Brickwork / Nurul Asyura Md Zaini
title_full Brickwork / Nurul Asyura Md Zaini
title_fullStr Brickwork / Nurul Asyura Md Zaini
title_full_unstemmed Brickwork / Nurul Asyura Md Zaini
title_sort brickwork / nurul asyura md zaini
publisher Universiti Teknologi MARA UiTM,Perak
publishDate 2022
url https://ir.uitm.edu.my/id/eprint/92466/1/92466.PDF
https://ir.uitm.edu.my/id/eprint/92466/
_version_ 1794641489386536960
score 13.160551