Highway construction for Kuala Terengganu bypass / Nur Shafira Amira Mohamed Zaidi

Highway construction is one of the biggest infrastructure construction all around the world. This highway construction will bring lots of convenience especially to the users. The report in broad-spectrum contains lots of contents in which will be explain in detail about the highway construct that co...

Full description

Saved in:
Bibliographic Details
Main Author: Mohamed Zaidi, Nur Shafira Amira
Format: Monograph
Language:English
Published: Universiti Teknologi MARA UiTM,Perak 2022
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/92054/1/92054.PDF
https://ir.uitm.edu.my/id/eprint/92054/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.92054
record_format eprints
spelling my.uitm.ir.920542024-03-15T08:47:20Z https://ir.uitm.edu.my/id/eprint/92054/ Highway construction for Kuala Terengganu bypass / Nur Shafira Amira Mohamed Zaidi Mohamed Zaidi, Nur Shafira Amira Road and highway design TH Building construction Highway construction is one of the biggest infrastructure construction all around the world. This highway construction will bring lots of convenience especially to the users. The report in broad-spectrum contains lots of contents in which will be explain in detail about the highway construct that constructed by the main contractor, Iswarabena Sdn. Bhd. This report was conducted for the construction of Projek Membina Kuala Terengganu Bypass located at Bukit Bayas, Jalan Pasir Panjang, 21100 Kuala Terengganu. The content of all chapters is broadly explained, and it is constructed from the practical basis of the site work ended all months. The objectives for this report are to identify the procedure for highway construction and machineries and equipment used. It is also focus on observing the problems occurred and solutions taken to solve the problems. This paper focus point is about method statement for highway construction including UHPC-beam that have been applied for this Kuala Terengganu Bypass. There are eleven procedures for the highway construction which start from site clearance until quality control and assurance. Over 6 years of this construction development, there are many winding up, problems and suggestion occurred on the project that the company runs. The extension of time is the most crucial problems since the contractor will face the financial problems, but the client agrees to extend the project period under Extension of Time (EOT3). Also, the revise of drawing also caused a problem since it can cause confusion and will affect the work progress and all the staff. Universiti Teknologi MARA UiTM,Perak 2022 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/92054/1/92054.PDF Highway construction for Kuala Terengganu bypass / Nur Shafira Amira Mohamed Zaidi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Road and highway design
TH Building construction
spellingShingle Road and highway design
TH Building construction
Mohamed Zaidi, Nur Shafira Amira
Highway construction for Kuala Terengganu bypass / Nur Shafira Amira Mohamed Zaidi
description Highway construction is one of the biggest infrastructure construction all around the world. This highway construction will bring lots of convenience especially to the users. The report in broad-spectrum contains lots of contents in which will be explain in detail about the highway construct that constructed by the main contractor, Iswarabena Sdn. Bhd. This report was conducted for the construction of Projek Membina Kuala Terengganu Bypass located at Bukit Bayas, Jalan Pasir Panjang, 21100 Kuala Terengganu. The content of all chapters is broadly explained, and it is constructed from the practical basis of the site work ended all months. The objectives for this report are to identify the procedure for highway construction and machineries and equipment used. It is also focus on observing the problems occurred and solutions taken to solve the problems. This paper focus point is about method statement for highway construction including UHPC-beam that have been applied for this Kuala Terengganu Bypass. There are eleven procedures for the highway construction which start from site clearance until quality control and assurance. Over 6 years of this construction development, there are many winding up, problems and suggestion occurred on the project that the company runs. The extension of time is the most crucial problems since the contractor will face the financial problems, but the client agrees to extend the project period under Extension of Time (EOT3). Also, the revise of drawing also caused a problem since it can cause confusion and will affect the work progress and all the staff.
format Monograph
author Mohamed Zaidi, Nur Shafira Amira
author_facet Mohamed Zaidi, Nur Shafira Amira
author_sort Mohamed Zaidi, Nur Shafira Amira
title Highway construction for Kuala Terengganu bypass / Nur Shafira Amira Mohamed Zaidi
title_short Highway construction for Kuala Terengganu bypass / Nur Shafira Amira Mohamed Zaidi
title_full Highway construction for Kuala Terengganu bypass / Nur Shafira Amira Mohamed Zaidi
title_fullStr Highway construction for Kuala Terengganu bypass / Nur Shafira Amira Mohamed Zaidi
title_full_unstemmed Highway construction for Kuala Terengganu bypass / Nur Shafira Amira Mohamed Zaidi
title_sort highway construction for kuala terengganu bypass / nur shafira amira mohamed zaidi
publisher Universiti Teknologi MARA UiTM,Perak
publishDate 2022
url https://ir.uitm.edu.my/id/eprint/92054/1/92054.PDF
https://ir.uitm.edu.my/id/eprint/92054/
_version_ 1794641442024456192
score 13.211869