Procedures of tender for upgrading the hot spring at Tok Bok, Machang, Kelantan / Nurul Afifah Mohd Asri
In an industrial training is one of the most important component for students to be awarded to the certificate degree. In four months, who wants to be getting the certificate degree, student must go to the industrial training at the selected company. The students will be place at private companies o...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA UiTM,Perak
2021
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/90614/1/90614.pdf https://ir.uitm.edu.my/id/eprint/90614/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.90614 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.906142024-02-27T06:42:54Z https://ir.uitm.edu.my/id/eprint/90614/ Procedures of tender for upgrading the hot spring at Tok Bok, Machang, Kelantan / Nurul Afifah Mohd Asri Mohd Asri, Nurul Afifah Management of the construction site. Superintendence of building construction In an industrial training is one of the most important component for students to be awarded to the certificate degree. In four months, who wants to be getting the certificate degree, student must go to the industrial training at the selected company. The students will be place at private companies or government agencies to practice them to real-life and working environment which is very different from the learning situation in college. In this chapter, it is all about the general information of selected company for practical training that have been chosen based on the requirement that have been stated. This information including the profile and the general information about the company background.The selected company is chosen based on requirement that have given by lecture and must be observed to all students. The company must have a scope of work related to students’ course such as construction, maintenance and about safety at the site project. In this chapter, it is also explained the organization of company start from header until the staff. That can be some information all about this company. Universiti Teknologi MARA UiTM,Perak 2021 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/90614/1/90614.pdf Procedures of tender for upgrading the hot spring at Tok Bok, Machang, Kelantan / Nurul Afifah Mohd Asri. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak. |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Management of the construction site. Superintendence of building construction |
spellingShingle |
Management of the construction site. Superintendence of building construction Mohd Asri, Nurul Afifah Procedures of tender for upgrading the hot spring at Tok Bok, Machang, Kelantan / Nurul Afifah Mohd Asri |
description |
In an industrial training is one of the most important component for students to be awarded to the certificate degree. In four months, who wants to be getting the certificate degree, student must go to the industrial training at the selected company. The students will be place at private companies or government agencies to practice them to real-life and working environment which is very different from the learning situation in college. In this chapter, it is all about the general information of selected company for practical training that have been chosen based on the requirement that have been stated. This information including the profile and the general information about the company background.The selected company is chosen based on requirement that have given by lecture and must be observed to all students. The company must have a scope of work related to students’ course such as construction, maintenance and about safety at the site project. In this chapter, it is also explained the organization of company start from header until the staff. That can be some information all about this company. |
format |
Monograph |
author |
Mohd Asri, Nurul Afifah |
author_facet |
Mohd Asri, Nurul Afifah |
author_sort |
Mohd Asri, Nurul Afifah |
title |
Procedures of tender for upgrading the hot spring at Tok Bok, Machang, Kelantan / Nurul Afifah Mohd Asri |
title_short |
Procedures of tender for upgrading the hot spring at Tok Bok, Machang, Kelantan / Nurul Afifah Mohd Asri |
title_full |
Procedures of tender for upgrading the hot spring at Tok Bok, Machang, Kelantan / Nurul Afifah Mohd Asri |
title_fullStr |
Procedures of tender for upgrading the hot spring at Tok Bok, Machang, Kelantan / Nurul Afifah Mohd Asri |
title_full_unstemmed |
Procedures of tender for upgrading the hot spring at Tok Bok, Machang, Kelantan / Nurul Afifah Mohd Asri |
title_sort |
procedures of tender for upgrading the hot spring at tok bok, machang, kelantan / nurul afifah mohd asri |
publisher |
Universiti Teknologi MARA UiTM,Perak |
publishDate |
2021 |
url |
https://ir.uitm.edu.my/id/eprint/90614/1/90614.pdf https://ir.uitm.edu.my/id/eprint/90614/ |
_version_ |
1792159477381726208 |
score |
13.15806 |