Fabrication of mini hydroelectric generator / Muhammad Firdaus Rashidy and Zeno Michael

The project is to fabricate a mini hydroelectric generator. Hydroelectric is a renewable energy that converts the kinetic energy of flowing water into electricity. A mini hydroelectric generator may utilise green energy and it can create awareness about how simple it is to use hydro energy. Therefor...

Full description

Saved in:
Bibliographic Details
Main Authors: Rashidy, Muhammad Firdaus, Michael, Zeno
Other Authors: Rusli, Ahmad Najmie
Format: Book Section
Language:English
Published: School of Mechanical Engineering 2022
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/90133/1/90133.pdf
https://ir.uitm.edu.my/id/eprint/90133/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.90133
record_format eprints
spelling my.uitm.ir.901332024-04-20T08:29:55Z https://ir.uitm.edu.my/id/eprint/90133/ Fabrication of mini hydroelectric generator / Muhammad Firdaus Rashidy and Zeno Michael Rashidy, Muhammad Firdaus Michael, Zeno Machine design and drawing Renewable energy sources The project is to fabricate a mini hydroelectric generator. Hydroelectric is a renewable energy that converts the kinetic energy of flowing water into electricity. A mini hydroelectric generator may utilise green energy and it can create awareness about how simple it is to use hydro energy. Therefore, the objective of this project is to design and analyse a mini power generator that reduces the cost and size to make it more versatile and easier to use by anyone. The methodologies used are by designing the final selected design product using Solidworks and fabricating it step-by-step starting from the body, turbine, shaft, and assembling them. There are measuring processes, cutting processes, and drilling processes. In addition, the relevance of my project is that it is lightweight and portable, uses renewable energy, is simple to install and reinstall, and is inexpensive. Unfortunately, the project failed to generate electricity. This is probably due to the speed is not enough to generate electricity. Hence, the result suggests that the product should add a reservoir and use a smaller generator to increase its speed. School of Mechanical Engineering Rusli, Ahmad Najmie Rasdi, Nurul Nadiah 2022 Book Section NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/90133/1/90133.pdf Fabrication of mini hydroelectric generator / Muhammad Firdaus Rashidy and Zeno Michael. (2022) In: Prototype Design Collection Series 1. School of Mechanical Engineering, Universiti Teknologi MARA, Johor, pp. 1-213. ISBN 978-967-0033-07-5
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Machine design and drawing
Renewable energy sources
spellingShingle Machine design and drawing
Renewable energy sources
Rashidy, Muhammad Firdaus
Michael, Zeno
Fabrication of mini hydroelectric generator / Muhammad Firdaus Rashidy and Zeno Michael
description The project is to fabricate a mini hydroelectric generator. Hydroelectric is a renewable energy that converts the kinetic energy of flowing water into electricity. A mini hydroelectric generator may utilise green energy and it can create awareness about how simple it is to use hydro energy. Therefore, the objective of this project is to design and analyse a mini power generator that reduces the cost and size to make it more versatile and easier to use by anyone. The methodologies used are by designing the final selected design product using Solidworks and fabricating it step-by-step starting from the body, turbine, shaft, and assembling them. There are measuring processes, cutting processes, and drilling processes. In addition, the relevance of my project is that it is lightweight and portable, uses renewable energy, is simple to install and reinstall, and is inexpensive. Unfortunately, the project failed to generate electricity. This is probably due to the speed is not enough to generate electricity. Hence, the result suggests that the product should add a reservoir and use a smaller generator to increase its speed.
author2 Rusli, Ahmad Najmie
author_facet Rusli, Ahmad Najmie
Rashidy, Muhammad Firdaus
Michael, Zeno
format Book Section
author Rashidy, Muhammad Firdaus
Michael, Zeno
author_sort Rashidy, Muhammad Firdaus
title Fabrication of mini hydroelectric generator / Muhammad Firdaus Rashidy and Zeno Michael
title_short Fabrication of mini hydroelectric generator / Muhammad Firdaus Rashidy and Zeno Michael
title_full Fabrication of mini hydroelectric generator / Muhammad Firdaus Rashidy and Zeno Michael
title_fullStr Fabrication of mini hydroelectric generator / Muhammad Firdaus Rashidy and Zeno Michael
title_full_unstemmed Fabrication of mini hydroelectric generator / Muhammad Firdaus Rashidy and Zeno Michael
title_sort fabrication of mini hydroelectric generator / muhammad firdaus rashidy and zeno michael
publisher School of Mechanical Engineering
publishDate 2022
url https://ir.uitm.edu.my/id/eprint/90133/1/90133.pdf
https://ir.uitm.edu.my/id/eprint/90133/
_version_ 1797924853451325440
score 13.19449