Optimizing toll collector scheduling using goal programming / Diana Sirmayunie Mohd Nasir ... [et al.]

The importance of providing an effective shift work schedule cannot be overstated, particularly when considering the continuous 24-hour service requirement. Each employee has their own schedule preferences, and while some positions offer just one or two shifts, others encompass three separate schedu...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohd Nasir, Diana Sirmayunie, Abu Hasan, Suzanawati, Shafii, Nor Hayati, Marhanith, Noreena Ayu
Format: Article
Language:English
Published: Universiti Teknologi MARA, Perak 2023
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/88210/1/88210.pdf
https://ir.uitm.edu.my/id/eprint/88210/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.88210
record_format eprints
spelling my.uitm.ir.882102023-12-12T08:56:30Z https://ir.uitm.edu.my/id/eprint/88210/ Optimizing toll collector scheduling using goal programming / Diana Sirmayunie Mohd Nasir ... [et al.] msij Mohd Nasir, Diana Sirmayunie Abu Hasan, Suzanawati Shafii, Nor Hayati Marhanith, Noreena Ayu Electronic Computers. Computer Science Programming. Rule-based programming. Backtrack programming The importance of providing an effective shift work schedule cannot be overstated, particularly when considering the continuous 24-hour service requirement. Each employee has their own schedule preferences, and while some positions offer just one or two shifts, others encompass three separate scheduling periods within a day. The issue arises when these varying schedules lead to disparities among workers of toll collectors in terms of overall time spent, creating an inequitable situation. Unfortunately, the objectives of the Bentong Toll Plaza and the preferences of the toll collectors have not been in harmony, which could potentially impact the performance and worklife balance of the toll collectors. The ongoing challenge faced by managers is the selection of the most suitable shift schedule. Thus, this study aims to introduce a new cyclic scheduling approach to streamline the task of creating schedules at Bentong Toll Plaza. Goad programming is applied to meet the requirements of four rigid constraints and three flexible constraints. The initial schedule is used for the first 15 days and then systematically rotated for another 15 days until all toll collectors have experienced all 15 schedule sets. This scheduling process was facilitated through the utilization of Lingo software, resulting in an optimized 15-day shift schedule for toll collectors. The third goal was achieved, which was that each toll collector was assigned the same amount of work. However, the first and second goals are not entirely met, but this has a minimal impact on the toll collectors due to the schedule rotation. In conclusion, it has been proven that the generated schedule pattern provides a better schedule in terms of providing each toll collector with the same total number of shifts and off days. Universiti Teknologi MARA, Perak 2023-11 Article PeerReviewed text en https://ir.uitm.edu.my/id/eprint/88210/1/88210.pdf Optimizing toll collector scheduling using goal programming / Diana Sirmayunie Mohd Nasir ... [et al.]. (2023) Mathematical Sciences and Informatics Journal (MIJ) <https://ir.uitm.edu.my/view/publication/Mathematical_Sciences_and_Informatics_Journal_=28MIJ=29/>, 4 (2). pp. 20-29. ISSN 2735-0703
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Electronic Computers. Computer Science
Programming. Rule-based programming. Backtrack programming
spellingShingle Electronic Computers. Computer Science
Programming. Rule-based programming. Backtrack programming
Mohd Nasir, Diana Sirmayunie
Abu Hasan, Suzanawati
Shafii, Nor Hayati
Marhanith, Noreena Ayu
Optimizing toll collector scheduling using goal programming / Diana Sirmayunie Mohd Nasir ... [et al.]
description The importance of providing an effective shift work schedule cannot be overstated, particularly when considering the continuous 24-hour service requirement. Each employee has their own schedule preferences, and while some positions offer just one or two shifts, others encompass three separate scheduling periods within a day. The issue arises when these varying schedules lead to disparities among workers of toll collectors in terms of overall time spent, creating an inequitable situation. Unfortunately, the objectives of the Bentong Toll Plaza and the preferences of the toll collectors have not been in harmony, which could potentially impact the performance and worklife balance of the toll collectors. The ongoing challenge faced by managers is the selection of the most suitable shift schedule. Thus, this study aims to introduce a new cyclic scheduling approach to streamline the task of creating schedules at Bentong Toll Plaza. Goad programming is applied to meet the requirements of four rigid constraints and three flexible constraints. The initial schedule is used for the first 15 days and then systematically rotated for another 15 days until all toll collectors have experienced all 15 schedule sets. This scheduling process was facilitated through the utilization of Lingo software, resulting in an optimized 15-day shift schedule for toll collectors. The third goal was achieved, which was that each toll collector was assigned the same amount of work. However, the first and second goals are not entirely met, but this has a minimal impact on the toll collectors due to the schedule rotation. In conclusion, it has been proven that the generated schedule pattern provides a better schedule in terms of providing each toll collector with the same total number of shifts and off days.
format Article
author Mohd Nasir, Diana Sirmayunie
Abu Hasan, Suzanawati
Shafii, Nor Hayati
Marhanith, Noreena Ayu
author_facet Mohd Nasir, Diana Sirmayunie
Abu Hasan, Suzanawati
Shafii, Nor Hayati
Marhanith, Noreena Ayu
author_sort Mohd Nasir, Diana Sirmayunie
title Optimizing toll collector scheduling using goal programming / Diana Sirmayunie Mohd Nasir ... [et al.]
title_short Optimizing toll collector scheduling using goal programming / Diana Sirmayunie Mohd Nasir ... [et al.]
title_full Optimizing toll collector scheduling using goal programming / Diana Sirmayunie Mohd Nasir ... [et al.]
title_fullStr Optimizing toll collector scheduling using goal programming / Diana Sirmayunie Mohd Nasir ... [et al.]
title_full_unstemmed Optimizing toll collector scheduling using goal programming / Diana Sirmayunie Mohd Nasir ... [et al.]
title_sort optimizing toll collector scheduling using goal programming / diana sirmayunie mohd nasir ... [et al.]
publisher Universiti Teknologi MARA, Perak
publishDate 2023
url https://ir.uitm.edu.my/id/eprint/88210/1/88210.pdf
https://ir.uitm.edu.my/id/eprint/88210/
_version_ 1787139582560567296
score 13.211869