The procedure of building plan approval for factory / Nur Arisa Saifullizan

The construction industry in Malaysia is growing at an incredible rate in tandem with the country's growth. Government and non-government organizations are doing excellent work to increase efficiency in the construction sector on a daily basis. Therefore, this report will discuss about the proj...

Full description

Saved in:
Bibliographic Details
Main Author: Saifullizan, Nur Arisa
Format: Monograph
Language:English
Published: Universiti Teknologi MARA UiTM,Perak 2022
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/87588/1/87588.pdf
https://ir.uitm.edu.my/id/eprint/87588/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.87588
record_format eprints
spelling my.uitm.ir.875882024-02-02T09:42:54Z https://ir.uitm.edu.my/id/eprint/87588/ The procedure of building plan approval for factory / Nur Arisa Saifullizan Saifullizan, Nur Arisa TH Building construction Construction equipment in building The construction industry in Malaysia is growing at an incredible rate in tandem with the country's growth. Government and non-government organizations are doing excellent work to increase efficiency in the construction sector on a daily basis. Therefore, this report will discuss about the project approval application process. This report was conducted for the proposed of getting permissions from the appropriate authorities to guarantee that the development adheres to the requirements set out in the building laws, and specific phases of construction are examined by local authority officers in range of Kuala Selangor District. The objective of this report is to identify the procedures that have been undertaken during the process of approval, to determine the characteristics of the building plan requirement, and to investigate the status of approval. It will examine how inspections are conducted and how the OSC's meeting decisions are made until the submission of letters and approved plan given to the applicant. This report will also look at the progress of the work process flow in its entirety. Universiti Teknologi MARA UiTM,Perak 2022 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/87588/1/87588.pdf The procedure of building plan approval for factory / Nur Arisa Saifullizan. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Construction equipment in building
spellingShingle TH Building construction
Construction equipment in building
Saifullizan, Nur Arisa
The procedure of building plan approval for factory / Nur Arisa Saifullizan
description The construction industry in Malaysia is growing at an incredible rate in tandem with the country's growth. Government and non-government organizations are doing excellent work to increase efficiency in the construction sector on a daily basis. Therefore, this report will discuss about the project approval application process. This report was conducted for the proposed of getting permissions from the appropriate authorities to guarantee that the development adheres to the requirements set out in the building laws, and specific phases of construction are examined by local authority officers in range of Kuala Selangor District. The objective of this report is to identify the procedures that have been undertaken during the process of approval, to determine the characteristics of the building plan requirement, and to investigate the status of approval. It will examine how inspections are conducted and how the OSC's meeting decisions are made until the submission of letters and approved plan given to the applicant. This report will also look at the progress of the work process flow in its entirety.
format Monograph
author Saifullizan, Nur Arisa
author_facet Saifullizan, Nur Arisa
author_sort Saifullizan, Nur Arisa
title The procedure of building plan approval for factory / Nur Arisa Saifullizan
title_short The procedure of building plan approval for factory / Nur Arisa Saifullizan
title_full The procedure of building plan approval for factory / Nur Arisa Saifullizan
title_fullStr The procedure of building plan approval for factory / Nur Arisa Saifullizan
title_full_unstemmed The procedure of building plan approval for factory / Nur Arisa Saifullizan
title_sort procedure of building plan approval for factory / nur arisa saifullizan
publisher Universiti Teknologi MARA UiTM,Perak
publishDate 2022
url https://ir.uitm.edu.my/id/eprint/87588/1/87588.pdf
https://ir.uitm.edu.my/id/eprint/87588/
_version_ 1792159418986528768
score 13.211869