The construction process of pad footing for 1 unit semi detached house / Nik Mohamed Syahmi Nik Mohamed Shaifuddin
The foundation of a building or civil structure is the element that connects it to the ground. It is located at the very bottom of the construction, in direct contact with the soil, and acts to transfer loads safely from the building to the ground. The depth of the soil in which a foundation is laid...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA UiTM,Perak
2022
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/87219/1/87219.pdf https://ir.uitm.edu.my/id/eprint/87219/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.87219 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.872192024-02-06T05:57:31Z https://ir.uitm.edu.my/id/eprint/87219/ The construction process of pad footing for 1 unit semi detached house / Nik Mohamed Syahmi Nik Mohamed Shaifuddin Nik Mohamed Shaifuddin, Nik Mohamed Syahmi TH Building construction Construction equipment in building The foundation of a building or civil structure is the element that connects it to the ground. It is located at the very bottom of the construction, in direct contact with the soil, and acts to transfer loads safely from the building to the ground. The depth of the soil in which a foundation is laid determines whether it is shallow or deep. The objective of this report is to study construction methods of pad footing, to identify the type of foundation used for the construction building and to determine the problems and solutions for substructures during construction of pad footing. This report also will look at the process construction of pad footing which is pad footing are a form of spread foundation formed by rectangular, square, or occasionally circular concrete ‘pads’ that support localized single point loads such as structural columns, groups of columns or framed structures. Universiti Teknologi MARA UiTM,Perak 2022 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/87219/1/87219.pdf The construction process of pad footing for 1 unit semi detached house / Nik Mohamed Syahmi Nik Mohamed Shaifuddin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted) |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
TH Building construction Construction equipment in building |
spellingShingle |
TH Building construction Construction equipment in building Nik Mohamed Shaifuddin, Nik Mohamed Syahmi The construction process of pad footing for 1 unit semi detached house / Nik Mohamed Syahmi Nik Mohamed Shaifuddin |
description |
The foundation of a building or civil structure is the element that connects it to the ground. It is located at the very bottom of the construction, in direct contact with the soil, and acts to transfer loads safely from the building to the ground. The depth of the soil in which a foundation is laid determines whether it is shallow or deep. The objective of this report is to study construction methods of pad footing, to identify the type of foundation used for the construction building and to determine the problems and solutions for substructures during construction of pad footing. This report also will look at the process construction of pad footing which is pad footing are a form of spread foundation formed by rectangular, square, or occasionally circular concrete ‘pads’ that support localized single point loads such as structural columns, groups of columns or framed structures. |
format |
Monograph |
author |
Nik Mohamed Shaifuddin, Nik Mohamed Syahmi |
author_facet |
Nik Mohamed Shaifuddin, Nik Mohamed Syahmi |
author_sort |
Nik Mohamed Shaifuddin, Nik Mohamed Syahmi |
title |
The construction process of pad footing for 1 unit semi detached house / Nik Mohamed Syahmi Nik Mohamed Shaifuddin |
title_short |
The construction process of pad footing for 1 unit semi detached house / Nik Mohamed Syahmi Nik Mohamed Shaifuddin |
title_full |
The construction process of pad footing for 1 unit semi detached house / Nik Mohamed Syahmi Nik Mohamed Shaifuddin |
title_fullStr |
The construction process of pad footing for 1 unit semi detached house / Nik Mohamed Syahmi Nik Mohamed Shaifuddin |
title_full_unstemmed |
The construction process of pad footing for 1 unit semi detached house / Nik Mohamed Syahmi Nik Mohamed Shaifuddin |
title_sort |
construction process of pad footing for 1 unit semi detached house / nik mohamed syahmi nik mohamed shaifuddin |
publisher |
Universiti Teknologi MARA UiTM,Perak |
publishDate |
2022 |
url |
https://ir.uitm.edu.my/id/eprint/87219/1/87219.pdf https://ir.uitm.edu.my/id/eprint/87219/ |
_version_ |
1792159415468556288 |
score |
13.188404 |