Construction of covered walkway at Jalan Hang Jebat infrastructure at PNB 118, Kuala Lumpur / Muhammad Zulfadzli Shamsulanizam
A Covered Walkway is a passage or path for people to walk along. Walkway can be constructed two ways either Precast Walkway or In-Situ Walkway. Walkway is an important thing that has been constructed and around the world has walkway. Walkway is really useful for pedestrians and additional Covered Wa...
Saved in:
Main Author: | Shamsulanizam, Muhammad Zulfadzli |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA UiTM,Perak
2022
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/87185/1/87185.pdf https://ir.uitm.edu.my/id/eprint/87185/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A building control point of view on demolition of full precast concrete buildings in Hong Kong / Kung Shu-hang, Raymond and Wu Po-tak, Alex
by: Kung, Shu-hang, Raymond, et al.
Published: (2012) -
A study on crane collapse in construction industry / Wan Azlinda W.Omar
by: W.Omar, Wan Azlinda
Published: (2015) -
The effectiveness of CCTV implementation by municipal council for public safety / Mohd Noor Adam Mohd Nordin
by: Mohd Nordin, Mohd Noor Adam
Published: (2008) -
Scaffolding's safety in the construction of high rise building / Mohd. Rosmizar Ishak
by: Ishak, Mohd. Rosmizar
Published: (2005) -
On site manufacturing (OSM) construction through lifting system for a modern high-rise building / Muhammad Fauzan Naim Murad and Mohd Rofdzi Abdullah
by: Murad, Muhammad Fauzan Naim, et al.
Published: (2019)