The post-construction process for new building of SSM Perak / Muhammad Najwan Razak
This report summarizes the process of post-construction, from completing all punch list items until the final process of post-construction. It is the result of five months of internship experience. The goal of this study is to outline the stages involved in post-construction process. There are two r...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA, Perak
2022
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/86053/2/86053.PDF https://ir.uitm.edu.my/id/eprint/86053/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.86053 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.860532024-02-04T02:27:41Z https://ir.uitm.edu.my/id/eprint/86053/ The post-construction process for new building of SSM Perak / Muhammad Najwan Razak Razak, Muhammad Najwan TH Building construction Construction equipment in building This report summarizes the process of post-construction, from completing all punch list items until the final process of post-construction. It is the result of five months of internship experience. The goal of this study is to outline the stages involved in post-construction process. There are two research methodologies used in this study to obtain more information about the process which is primary and secondary. There are two types of primary research which observation and interviews. Observations were made by referring to previous tender papers and related document. In addition, during the interview, I connected with someone who has prior expertise with the process of post-construction. The procedures of all the post-construction process are outlined in this report. Universiti Teknologi MARA, Perak 2022 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/86053/2/86053.PDF The post-construction process for new building of SSM Perak / Muhammad Najwan Razak. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished) |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
TH Building construction Construction equipment in building |
spellingShingle |
TH Building construction Construction equipment in building Razak, Muhammad Najwan The post-construction process for new building of SSM Perak / Muhammad Najwan Razak |
description |
This report summarizes the process of post-construction, from completing all punch list items until the final process of post-construction. It is the result of five months of internship experience. The goal of this study is to outline the stages involved in post-construction process. There are two research methodologies used in this study to obtain more information about the process which is primary and secondary. There are two types of primary research which observation and interviews. Observations were made by referring to previous tender papers and related document. In addition, during the interview, I connected with someone who has prior expertise with the process of post-construction. The procedures of all the post-construction process are outlined in this report. |
format |
Monograph |
author |
Razak, Muhammad Najwan |
author_facet |
Razak, Muhammad Najwan |
author_sort |
Razak, Muhammad Najwan |
title |
The post-construction process for new building of SSM Perak / Muhammad Najwan Razak |
title_short |
The post-construction process for new building of SSM Perak / Muhammad Najwan Razak |
title_full |
The post-construction process for new building of SSM Perak / Muhammad Najwan Razak |
title_fullStr |
The post-construction process for new building of SSM Perak / Muhammad Najwan Razak |
title_full_unstemmed |
The post-construction process for new building of SSM Perak / Muhammad Najwan Razak |
title_sort |
post-construction process for new building of ssm perak / muhammad najwan razak |
publisher |
Universiti Teknologi MARA, Perak |
publishDate |
2022 |
url |
https://ir.uitm.edu.my/id/eprint/86053/2/86053.PDF https://ir.uitm.edu.my/id/eprint/86053/ |
_version_ |
1792159411349749760 |
score |
13.211869 |