This report describes and explains my journey of internship training at PJZSB Construction within 14 weeks to fulfill the requirement for Apprenticeship. The training started from 23th August 2021 and ended on 06th January 2022 with estimated duration of 14 weeks. PJZSB Construction is a well-known...

Full description

Saved in:
Bibliographic Details
Main Author: Arifin, Muhammad Fahmi
Format: Monograph
Language:English
Published: Universiti Teknologi MARA, Perak 2021
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/85843/2/85843.PDF
https://ir.uitm.edu.my/id/eprint/85843/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.85843
record_format eprints
spelling my.uitm.ir.858432024-01-16T18:17:13Z https://ir.uitm.edu.my/id/eprint/85843/ Construction of structure bridge in Kelantan Darul Naim / Muhammad Fahmi Arifin Arifin, Muhammad Fahmi Construction by phase of the work (Building trades) This report describes and explains my journey of internship training at PJZSB Construction within 14 weeks to fulfill the requirement for Apprenticeship. The training started from 23th August 2021 and ended on 06th January 2022 with estimated duration of 14 weeks. PJZSB Construction is a well-known construction company in Malaysia originally known as Pembinaan Jaya Zira Sdn Bhd (PJZSB). The internship training was located in Gua Musang Street, Kelantan. During internship training, I experienced new tasks, work cultures and values in Public Relations and Corporate Communication. This is the first time I experienced real hands-on working environment since both Public Relations and Corporate Communication are quite different from what I studied. Initially, I felt difficult and challenging to adapt with the new environment and the work nature, but eventually I managed to adapt and keep learning from my fellow colleague at PJZSB Construction. While completing the internship, some of my ideas were rejected and some were modified and these experiences helps me to improve myself better and prevent from repeating the same mistakes. My supervisors always give constructive whenever I did some mistakes and I found that it is quite helpful for me to learn and adapt with the new environment. I learned that as a human being; it is normal to make mistakes but somehow we can avoid the mistakes from happening twice by following the procedures. Other than that, the internship program exposed me on how the company runs which is totally different from what being taught in the classroom. I faced with shorter due dates during the internship training which helps me increase my work productivity and critical thinking when creating a new content or completing the task given. Moreover, I’m able to improve my self-confidence and responsibilities towards the task given during the internship period. This can be considered as a preparation for me before starting my future career path. In a nutshell, I believe that this Integrated Internship Program at PJZSB Construction provides me with various work experiences, work cultures and work values which is crucial for me to begin with my future career path. By completing the internship training I believe that this program helps the student in adapting and preparing with the real working environment; despite of the MCO announcement and the SOPs given by the government throughout the training session. I also learned that students should prepare themselves better in language proficiency especially in Bahasa Malaysia and English to strengthen oral presentation and writing skills. Universiti Teknologi MARA, Perak 2021 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/85843/2/85843.PDF Construction of structure bridge in Kelantan Darul Naim / Muhammad Fahmi Arifin. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Construction by phase of the work (Building trades)
spellingShingle Construction by phase of the work (Building trades)
Arifin, Muhammad Fahmi
Construction of structure bridge in Kelantan Darul Naim / Muhammad Fahmi Arifin
description This report describes and explains my journey of internship training at PJZSB Construction within 14 weeks to fulfill the requirement for Apprenticeship. The training started from 23th August 2021 and ended on 06th January 2022 with estimated duration of 14 weeks. PJZSB Construction is a well-known construction company in Malaysia originally known as Pembinaan Jaya Zira Sdn Bhd (PJZSB). The internship training was located in Gua Musang Street, Kelantan. During internship training, I experienced new tasks, work cultures and values in Public Relations and Corporate Communication. This is the first time I experienced real hands-on working environment since both Public Relations and Corporate Communication are quite different from what I studied. Initially, I felt difficult and challenging to adapt with the new environment and the work nature, but eventually I managed to adapt and keep learning from my fellow colleague at PJZSB Construction. While completing the internship, some of my ideas were rejected and some were modified and these experiences helps me to improve myself better and prevent from repeating the same mistakes. My supervisors always give constructive whenever I did some mistakes and I found that it is quite helpful for me to learn and adapt with the new environment. I learned that as a human being; it is normal to make mistakes but somehow we can avoid the mistakes from happening twice by following the procedures. Other than that, the internship program exposed me on how the company runs which is totally different from what being taught in the classroom. I faced with shorter due dates during the internship training which helps me increase my work productivity and critical thinking when creating a new content or completing the task given. Moreover, I’m able to improve my self-confidence and responsibilities towards the task given during the internship period. This can be considered as a preparation for me before starting my future career path. In a nutshell, I believe that this Integrated Internship Program at PJZSB Construction provides me with various work experiences, work cultures and work values which is crucial for me to begin with my future career path. By completing the internship training I believe that this program helps the student in adapting and preparing with the real working environment; despite of the MCO announcement and the SOPs given by the government throughout the training session. I also learned that students should prepare themselves better in language proficiency especially in Bahasa Malaysia and English to strengthen oral presentation and writing skills.
format Monograph
author Arifin, Muhammad Fahmi
author_facet Arifin, Muhammad Fahmi
author_sort Arifin, Muhammad Fahmi
title Construction of structure bridge in Kelantan Darul Naim / Muhammad Fahmi Arifin
title_short Construction of structure bridge in Kelantan Darul Naim / Muhammad Fahmi Arifin
title_full Construction of structure bridge in Kelantan Darul Naim / Muhammad Fahmi Arifin
title_fullStr Construction of structure bridge in Kelantan Darul Naim / Muhammad Fahmi Arifin
title_full_unstemmed Construction of structure bridge in Kelantan Darul Naim / Muhammad Fahmi Arifin
title_sort construction of structure bridge in kelantan darul naim / muhammad fahmi arifin
publisher Universiti Teknologi MARA, Perak
publishDate 2021
url https://ir.uitm.edu.my/id/eprint/85843/2/85843.PDF
https://ir.uitm.edu.my/id/eprint/85843/
_version_ 1789429223922860032
score 13.18916