Architecture drawing process (construction drawing ) / Muhammad Al Fateh Aqasya Mohd Nazim
Generally this report briefly explained about Construction drawing process made by architect in Jabatan Kerja Raya. Basically Construction drawing in Jabatan Kerja Raya is divided by 3 drawing which is, Tender drawing, Bomba drawing and PJC drawing. Tender drawing is the drawing that we do for quant...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA, Perak
2022
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/84188/2/84188.PDF https://ir.uitm.edu.my/id/eprint/84188/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!