Renovation in construction: Defect liability period / Muhammad Afif Akmal Mohd Shafiee
This industrial training report of Muhammad Afif Akmal bin Mohd Shafiee to undergo an industrial training for duration of 4 month which consist of 20 weeks before completing the Diploma in Building. Student are required to do practical training from 23rd August to 7th January 2022. The purpose of th...
Saved in:
Main Author: | Mohd Shafiee, Muhammad Afif Akmal |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA, Perak
2022
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/84081/2/84081.pdf https://ir.uitm.edu.my/id/eprint/84081/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Building inspection for defect liability period at Setia ECO Glades Cyberjaya / Nurul Najah Nasrul
by: Nasrul, Nurul Najah
Published: (2022) -
Defect liability period, DLP (contractor responsibilities) / Abdillah Azizi Abdul Mu’en
by: Abdul Mu’en, Abdillah Azizi
Published: (2018) -
A study on building defects in newly completed high-rise residential buildings during defects liability period / Zarul Azkief Che Zulkifli
by: Che Zulkifli, Zarul Azkief
Published: (2009) -
A study on the issues of the maintenance works during defect liability period for projects under Majlis Perbandaran Taiping / Marlia Abdul Wahab
by: Abdul Wahab, Marlia
Published: (2009) -
Inspection defect / Muhammad Afif Aidid
by: Aidid, Muhammad Afif
Published: (2015)