The construction process of strip footing for 465 units single storey house / Mohammad Nazirul Mubin Mohd Rasfan
Substructure is one of the important things to be considered in construction process. Therefore, this report will discuss about substructure works based on Energiser Enterprise Sdn. Bhd. Specification. This report is conducted at Cadangan Pembangunan Secara Usahasama Program Khas Perumahan Perwira N...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA, Perak
2022
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/83929/2/83929.PDF https://ir.uitm.edu.my/id/eprint/83929/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.83929 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.839292023-12-15T07:11:47Z https://ir.uitm.edu.my/id/eprint/83929/ The construction process of strip footing for 465 units single storey house / Mohammad Nazirul Mubin Mohd Rasfan Mohd Rasfan, Mohammad Nazirul Mubin House construction Substructure is one of the important things to be considered in construction process. Therefore, this report will discuss about substructure works based on Energiser Enterprise Sdn. Bhd. Specification. This report is conducted at Cadangan Pembangunan Secara Usahasama Program Khas Perumahan Perwira Negeri Perak (PKPPNP) Di Atas Lot 11523, Lot 11530 Dan Sebahagian Lot 10940 (Tanah Kerajaan), Mukim Bota, Daerah Perak Tengah, Perak Darul Ridzuan. The objective of this report is to study the construction method of strip footing. This report focused on all works related to concreting works and all the machineries and equipment used. This report also looks at the problems occurred during construction and their solutions. The strength of substructure is important for long term to make sure the building structure does not collapse, and all the load is properly distributed to the ground. Universiti Teknologi MARA, Perak 2022 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/83929/2/83929.PDF The construction process of strip footing for 465 units single storey house / Mohammad Nazirul Mubin Mohd Rasfan. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted) |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
House construction |
spellingShingle |
House construction Mohd Rasfan, Mohammad Nazirul Mubin The construction process of strip footing for 465 units single storey house / Mohammad Nazirul Mubin Mohd Rasfan |
description |
Substructure is one of the important things to be considered in construction process. Therefore, this report will discuss about substructure works based on Energiser Enterprise Sdn. Bhd. Specification. This report is conducted at Cadangan Pembangunan Secara Usahasama Program Khas Perumahan Perwira Negeri Perak (PKPPNP) Di Atas Lot 11523, Lot 11530 Dan Sebahagian Lot 10940 (Tanah Kerajaan), Mukim Bota, Daerah Perak Tengah, Perak Darul Ridzuan. The objective of this report is to study the construction method of strip footing. This report focused on all works related to concreting works and all the machineries and equipment used. This report also looks at the problems occurred during construction and their solutions. The strength of substructure is important for long term to make sure the building structure does not collapse, and all the load is properly distributed to the ground. |
format |
Monograph |
author |
Mohd Rasfan, Mohammad Nazirul Mubin |
author_facet |
Mohd Rasfan, Mohammad Nazirul Mubin |
author_sort |
Mohd Rasfan, Mohammad Nazirul Mubin |
title |
The construction process of strip footing for 465 units single storey house / Mohammad Nazirul Mubin Mohd Rasfan |
title_short |
The construction process of strip footing for 465 units single storey house / Mohammad Nazirul Mubin Mohd Rasfan |
title_full |
The construction process of strip footing for 465 units single storey house / Mohammad Nazirul Mubin Mohd Rasfan |
title_fullStr |
The construction process of strip footing for 465 units single storey house / Mohammad Nazirul Mubin Mohd Rasfan |
title_full_unstemmed |
The construction process of strip footing for 465 units single storey house / Mohammad Nazirul Mubin Mohd Rasfan |
title_sort |
construction process of strip footing for 465 units single storey house / mohammad nazirul mubin mohd rasfan |
publisher |
Universiti Teknologi MARA, Perak |
publishDate |
2022 |
url |
https://ir.uitm.edu.my/id/eprint/83929/2/83929.PDF https://ir.uitm.edu.my/id/eprint/83929/ |
_version_ |
1787139527353040896 |
score |
13.209306 |