Construction work: Steel framing system / Fauzan Aizat Azri

"Industrialized Building System" (IBS) is a prefabricated construction technique or building construction method. Components are produced under controlled conditions (at the factory or at the construction site) and carried and installed at the building construction site with minimal use of...

Full description

Saved in:
Bibliographic Details
Main Author: Azri, Fauzan Aizat
Format: Monograph
Language:English
Published: Universiti Teknologi MARA, Perak 2022
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/83725/2/83725.pdf
https://ir.uitm.edu.my/id/eprint/83725/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.83725
record_format eprints
spelling my.uitm.ir.837252023-12-14T04:42:36Z https://ir.uitm.edu.my/id/eprint/83725/ Construction work: Steel framing system / Fauzan Aizat Azri Azri, Fauzan Aizat Details in building design and construction.Including walls, roofs "Industrialized Building System" (IBS) is a prefabricated construction technique or building construction method. Components are produced under controlled conditions (at the factory or at the construction site) and carried and installed at the building construction site with minimal use of workers. IBS should be used together with a Pre-Approved Plan (PAP) while implementing the project. The objective of this report is to explain the advantages of a construction if using the “Industrial Building Construction System”. Among the objectives of (IBS) are improving the quality and productivity of construction and speeding up the construction period. Government agencies should refer to the Manual for Industrialized document Building System (IBS) Construction Industry Standard (CIS 18: 2018) for IBS calculation method published by the Industrial Development Board Construction (CIDB). The government has decided to make the IBS technique essential for government projects of RM10 million or more, with a minimum rate of 70% IBS score value, as well as to define the modular coordination to be utilised as building design guidelines. The implementation of this IBS is applicable to the procurement of work by tender and negotiations continue. The installation of IBS components shall be carried out by a skilled worker recognized by CIDB. An open IBS system can be used in building construction execution, i.e. an IBS component system that emphasises the design of something building based on the use of the Modular Coordination standard, MS 1064. It is open to all usable structural components adopted from various IBS manufacturers to build a building. Universiti Teknologi MARA, Perak 2022 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/83725/2/83725.pdf Construction work: Steel framing system / Fauzan Aizat Azri. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Details in building design and construction.Including walls, roofs
spellingShingle Details in building design and construction.Including walls, roofs
Azri, Fauzan Aizat
Construction work: Steel framing system / Fauzan Aizat Azri
description "Industrialized Building System" (IBS) is a prefabricated construction technique or building construction method. Components are produced under controlled conditions (at the factory or at the construction site) and carried and installed at the building construction site with minimal use of workers. IBS should be used together with a Pre-Approved Plan (PAP) while implementing the project. The objective of this report is to explain the advantages of a construction if using the “Industrial Building Construction System”. Among the objectives of (IBS) are improving the quality and productivity of construction and speeding up the construction period. Government agencies should refer to the Manual for Industrialized document Building System (IBS) Construction Industry Standard (CIS 18: 2018) for IBS calculation method published by the Industrial Development Board Construction (CIDB). The government has decided to make the IBS technique essential for government projects of RM10 million or more, with a minimum rate of 70% IBS score value, as well as to define the modular coordination to be utilised as building design guidelines. The implementation of this IBS is applicable to the procurement of work by tender and negotiations continue. The installation of IBS components shall be carried out by a skilled worker recognized by CIDB. An open IBS system can be used in building construction execution, i.e. an IBS component system that emphasises the design of something building based on the use of the Modular Coordination standard, MS 1064. It is open to all usable structural components adopted from various IBS manufacturers to build a building.
format Monograph
author Azri, Fauzan Aizat
author_facet Azri, Fauzan Aizat
author_sort Azri, Fauzan Aizat
title Construction work: Steel framing system / Fauzan Aizat Azri
title_short Construction work: Steel framing system / Fauzan Aizat Azri
title_full Construction work: Steel framing system / Fauzan Aizat Azri
title_fullStr Construction work: Steel framing system / Fauzan Aizat Azri
title_full_unstemmed Construction work: Steel framing system / Fauzan Aizat Azri
title_sort construction work: steel framing system / fauzan aizat azri
publisher Universiti Teknologi MARA, Perak
publishDate 2022
url https://ir.uitm.edu.my/id/eprint/83725/2/83725.pdf
https://ir.uitm.edu.my/id/eprint/83725/
_version_ 1787139523371597824
score 13.159267