Electrical installation challenges in steel framing system: Case study at District of Kuala Muda / Nur Husnina Zawari
Industrialized Building System (IBS) have start begin in Malaysia in early years 1960s and it is known as the precast concrete or prefabricated concrete. The Industrialize Building System (IBS) is prefabrication concrete that will involves the manufacture of components such as wall off site that ar...
Saved in:
Main Author: | Zawari, Nur Husnina |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2021
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/82887/1/82887.pdf https://ir.uitm.edu.my/id/eprint/82887/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Maintenance management of Phileo Damansara 1/ Nur Husnina Zawari
by: Zawari, Nur Husnina
Published: (2022) -
Steel structure installation (frame structure) / Mohamad Nazrul Amir Zulkifli
by: Zulkifli, Mohamad Nazrul Amir
Published: (2021) -
Fish waste as Biofertilizer / Nur Husnina Hadzeri
by: Hadzeri, Nur Husnina
Published: (2018) -
Mechanical and electrical installation / Nur Nabilah Hannah Ghazali
by: Hannah Ghazali, Nur Nabilah
Published: (2013) -
Steel frame assembly robot / Nur Syarfa binti Romli and Zulkifli bin Ab Halim
by: Romli, Nur Syarfa, et al.
Published: (2019)