Method statement on testing of pile foundation / Mohamad Nazmi Ghumat

This report reviews the procedure of pile test on the construction site from the experience and information gained from practical training for 5 months. In this report also explained about the types and new technology in term of using the testing of pile. Numerous benefits are obtained through the d...

Full description

Saved in:
Bibliographic Details
Main Author: Ghumat, Mohamad Nazmi
Format: Monograph
Language:English
Published: Universiti Teknologi MARA, Perak 2013
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/80984/1/80984.pdf
https://ir.uitm.edu.my/id/eprint/80984/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.80984
record_format eprints
spelling my.uitm.ir.809842023-08-22T03:35:02Z https://ir.uitm.edu.my/id/eprint/80984/ Method statement on testing of pile foundation / Mohamad Nazmi Ghumat Ghumat, Mohamad Nazmi Construction equipment in building This report reviews the procedure of pile test on the construction site from the experience and information gained from practical training for 5 months. In this report also explained about the types and new technology in term of using the testing of pile. Numerous benefits are obtained through the development of new technological equipment for pile testing in the construction field. Materials and machinery used vary widely according to the methods and processes that are performed in construction. In addition, this report shows the latest equipment used during the testing. The technology solved construction problems associated with pile foundations, and recommends criteria based on current knowledge. There are some problems that have been identified in terms of the construction of pile, but all the problems have been solved with some suggestions. Hopefully it can help and can improve to expand the construction industry. This report is divided into several sections which consist of an introduction to the background and the background of the construction project. The company background included in this report describes the location of the company, the company operates, the type of companies involved as well as the organization chart and company logo. As a result of the observation, work methods and processes involved in the construction of this high-rise building are very difficult and not as easy as expected. The construction process is quite complicated and involves many parties which need to have expertise and skills in the construction field. Each construction process is done with careful to avoid mistakes. In conclusion, this report will explain more detail about the method of testing on pile and maybe it can give new information practically to the readers. Universiti Teknologi MARA, Perak 2013 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/80984/1/80984.pdf Method statement on testing of pile foundation / Mohamad Nazmi Ghumat. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Construction equipment in building
spellingShingle Construction equipment in building
Ghumat, Mohamad Nazmi
Method statement on testing of pile foundation / Mohamad Nazmi Ghumat
description This report reviews the procedure of pile test on the construction site from the experience and information gained from practical training for 5 months. In this report also explained about the types and new technology in term of using the testing of pile. Numerous benefits are obtained through the development of new technological equipment for pile testing in the construction field. Materials and machinery used vary widely according to the methods and processes that are performed in construction. In addition, this report shows the latest equipment used during the testing. The technology solved construction problems associated with pile foundations, and recommends criteria based on current knowledge. There are some problems that have been identified in terms of the construction of pile, but all the problems have been solved with some suggestions. Hopefully it can help and can improve to expand the construction industry. This report is divided into several sections which consist of an introduction to the background and the background of the construction project. The company background included in this report describes the location of the company, the company operates, the type of companies involved as well as the organization chart and company logo. As a result of the observation, work methods and processes involved in the construction of this high-rise building are very difficult and not as easy as expected. The construction process is quite complicated and involves many parties which need to have expertise and skills in the construction field. Each construction process is done with careful to avoid mistakes. In conclusion, this report will explain more detail about the method of testing on pile and maybe it can give new information practically to the readers.
format Monograph
author Ghumat, Mohamad Nazmi
author_facet Ghumat, Mohamad Nazmi
author_sort Ghumat, Mohamad Nazmi
title Method statement on testing of pile foundation / Mohamad Nazmi Ghumat
title_short Method statement on testing of pile foundation / Mohamad Nazmi Ghumat
title_full Method statement on testing of pile foundation / Mohamad Nazmi Ghumat
title_fullStr Method statement on testing of pile foundation / Mohamad Nazmi Ghumat
title_full_unstemmed Method statement on testing of pile foundation / Mohamad Nazmi Ghumat
title_sort method statement on testing of pile foundation / mohamad nazmi ghumat
publisher Universiti Teknologi MARA, Perak
publishDate 2013
url https://ir.uitm.edu.my/id/eprint/80984/1/80984.pdf
https://ir.uitm.edu.my/id/eprint/80984/
_version_ 1775626401819394048
score 13.160551