Installation of aluminium cladding / Mohamad Aqmal Mohamed Johar Fikri

This report described about fabrication and installation of aluminium cladding to built a new headquarters of Kuantan Municipal Council. This report was reported based on the observation and experience of five month at the construction project. This report is divided into several of parts beginning...

Full description

Saved in:
Bibliographic Details
Main Author: Mohamed Johar Fikri, Mohamad Aqmal
Format: Monograph
Language:English
Published: Universiti Teknologi MARA, Perak 2014
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/79662/1/79662.pdf
https://ir.uitm.edu.my/id/eprint/79662/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This report described about fabrication and installation of aluminium cladding to built a new headquarters of Kuantan Municipal Council. This report was reported based on the observation and experience of five month at the construction project. This report is divided into several of parts beginning with an introduction, company background, case study, conclusion and suggestion. From the observation the maintenance process of fabrication and installation is very simple but only certain person can do it. This report, described about identifying and understanding the equipment, machineries and material used in completing fab1ication of aluminium cladding. Beside that to identify the process before installation the aluminium cladding and determine the method of construction for aluminium cladding applied specifically for high rise building.