Method statement of strip foundation and detail of the design / Amir Rusydi Zolkfle

This report briefly describes the method statement of continuous foundation and the detail of the design. Method statement of continuous foundation will be observed at site while the detail of design of foundation will take the information at the office headquarters, asking the designer. The method...

Full description

Saved in:
Bibliographic Details
Main Author: Zolkfle, Amir Rusydi
Format: Student Project
Language:English
Published: 2015
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/77742/1/77742.pdf
https://ir.uitm.edu.my/id/eprint/77742/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This report briefly describes the method statement of continuous foundation and the detail of the design. Method statement of continuous foundation will be observed at site while the detail of design of foundation will take the information at the office headquarters, asking the designer. The method base on the site that stationed whenever the foundation construct on process. Asking the contractor about the detail of installation, and put all the information on the paper and take picture to prove it as the process. For the detail of continuous design, interviews have been done with engineer who design it and all the information has stated.